







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Garage Conversion ADU in Richland Hills, TX: What It Costs and How Long It Takes
A garage conversion ADU in Richland Hills usually runs $45,000 – $130,000 and takes 8 to 14 weeks from permit to final inspection, depending on whether you’re adding a bathroom, kitchenette, or a full second living unit. Most conversions here land in the $60,000 – $85,000 range. Call (855) 912-5373 for a free on-site estimate and a written line-item quote.
How a garage conversion actually gets built, stage by stage

The sequence matters more than the sales pitch. Here’s what happens on a real conversion in Richland Hills and when you’ll be asked to make decisions.
- Day 1 – 3: Scope walk and permit drawings. We measure the slab, check the existing electrical panel, confirm whether the garage shares a wall with living space, and photograph the framing. You’ll decide the layout (studio vs. one-bedroom vs. one-bed with bath) and whether you want a kitchenette. Drawings go to the city, and in a compact, fully built-out town like Richland Hills the permit review is the first real schedule variable.
- Week 2 – 3: Demo and structural prep. Out comes the garage door and opener, the old slab gets inspected for cracks and moisture, and any undersized framing or dated wiring that shows up once walls open gets addressed. North Texas clay movement means we check the slab for settlement before we frame on top of it.
- Week 3 – 6: Framing, electrical, plumbing, HVAC. New walls, a proper ceiling height, rough-in for the bathroom and kitchenette, and a dedicated HVAC mini-split or tie-in to the house system. You’ll choose fixture locations here, and this is the stage where relocating a drain or moving a load-bearing post adds money.
- Week 6 – 9: Insulation, drywall, exterior skin. Hail-rated exterior materials go on, the old garage door opening gets closed in with matching siding or brick, and the interior gets taped and primed. Inspection windows happen between these steps.
- Week 9 – 14: Finishes and final inspection. Flooring, trim, paint, final electrical and plumbing trim-out, and the city’s final walkthrough. You pick finishes in week 3 so nothing sits waiting on a decision.
Every conversion gets our 730-Day Done Right Promise, backed in writing. If something isn’t right, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll actually make on a garage conversion ADU
These are the decisions that move the number and the durability, and the honest trade-offs on each.
- Slab-on-grade vs. raised floor. A slab keeps the ceiling higher and costs less, but North Texas clay soils mean we test for movement first. A raised subfloor costs more and eats 6 to 8 inches of headroom, though it lets plumbing run underneath without cutting the slab.
- Mini-split vs. tied-in HVAC. A dedicated mini-split runs quieter and gives the tenant independent control; tying into the house system is cheaper upfront but strains an older unit. Most Richland Hills conversions of 1950s – 70s homes get the mini-split.
- Exterior skin. Matching the original brick keeps the house looking like one building. Fiber cement siding is faster and less expensive and takes hail better than vinyl.
- Wet bath vs. kitchenette-only. A full bath adds roughly $12,000 – $22,000 and the plumbing rough-in; a kitchenette with a sink and small fridge runs less and covers most rental or in-law uses.
- Flooring. Luxury vinyl plank handles moisture and traffic and suits most conversions. Tile in the bath is worth the upgrade.
We carry verified brand partners across materials, so you’re choosing quality, not whatever’s on the shelf.
What a Garage Conversion ADU costs in Richland Hills, TX

The lead range is $45,000 – $130,000, and the biggest drivers are whether you add a bathroom, how much electrical and structural work the old garage needs, and finish grade.
| Line item | Typical range |
|---|---|
| Base conversion (demo, framing, drywall, electrical, finishes) | $45,000 – $75,000 |
| Full bathroom addition | $12,000 – $22,000 |
| Kitchenette | $8,000 – $18,000 |
| HVAC mini-split system | $4,000 – $9,000 |
| Electrical panel upgrade (if needed) | $2,000 – $5,000 |
| Structural repair for slab or framing | $3,000 – $15,000 |
Your written estimate includes labor, materials, permits, inspections, and cleanup. It doesn’t include major structural surprises hidden behind drywall, which is why we inspect before we quote, not after. Pricing is upfront, no surprises, and 0% financing for 18 months plus $1,000 off projects over $10,000 help make a five-figure conversion workable.
See the difference
Before
After
Before
After
Before
AfterWhat Richland Hills homes specifically do to this job
Richland Hills (ZIP 76118) is a fully built-out inner-ring suburb, mostly developed between the 1950s and 1970s, so garage conversions here start with a postwar garage attached to a small brick ranch. That means two recurring realities. First, the clay soil across Richland Hills and neighboring Haltom City moves with drought and rain, and a garage slab often shows cracks or settlement we have to address before we build on it. Second, older homes hide undersized framing and dated wiring once walls open, and the original electrical panel frequently won’t carry a second living unit without an upgrade. The city’s permitting and code enforcement runs through its own inspection process, so we build to what the inspector will sign off on. If your conversion is part of a larger project, it fits naturally with our Home Additions & ADU in Richland Hills work, and homeowners often pair this with a new approach apron from Concrete Driveways & Concrete Work in Richland Hills once the old garage door comes out. We cover the whole of Richland Hills, and our Home Additions & ADU service handles the wider scope when you’re ready to go bigger.
Serving Richland Hills, TX – Our Local Coverage Area
We serve Richland Hills and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked questions about Garage Conversion ADU in Richland Hills

Expect 8 to 14 weeks from permit issuance to final inspection. Permit review and any structural repair are the two biggest schedule variables on a postwar Richland Hills garage.
Yes, a garage conversion ADU requires a permit and inspections in Richland Hills. The city reviews the drawings, and the final conversion gets inspected before it’s legal to occupy. We pull the permit and pass the inspections.
Often, yes, if you’re converting to a studio or one-bedroom without a full bath. Adding a bath or kitchenette means running new drains, which is where the plumbing cost shows up. We tell you in the first walk-through which path fits your garage.
Most conversions run $45,000 – $130,000, with the typical job landing between $60,000 and $85,000. A full bath, panel upgrade, or slab repair pushes you toward the high end. Call (855) 912-5373 for an exact quote, and estimates are free.
Every conversion is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction. If it isn’t done right, we make it right.
Get a free estimate for your Richland Hills garage conversion
Call (855) 912-5373 to schedule a free on-site estimate for your garage conversion ADU in Richland Hills. We walk the garage, check the slab and panel, talk through layout and budget, and leave you with a written line-item quote. Upfront pricing, permits pulled, inspections passed, and a live person answers the phone any time, day or night.
Written by the team at Groundwork Construction Co.












