Garage Conversion ADU in Bedford: What It Takes and What It Costs
A garage conversion ADU in Bedford typically runs $45,000 – $130,000 and takes 3 to 5 months from permit to final inspection. The job turns an attached or detached garage into a legal, livable secondary unit: new slab or subfloor, insulated walls, HVAC, plumbing for a kitchenette and bath, electrical, and a separate entrance. Call (855) 912-5373 for a free on-site estimate before you commit to a single line of design.
How a Garage Conversion ADU Comes Together, Stage by Stage

Most contractors wave at this work and call it a remodel. It isn’t. A garage conversion touches structure, envelope, mechanicals, and life-safety all at once, and the sequence matters because one skipped inspection can stall the next three trades. Here’s the order we work in.
Stage 1: Feasibility and permit set (weeks 1 – 3)
Before anything gets demoed, we check the garage’s slab, ceiling height, and how the unit attaches to the main house. We confirm egress window locations and draft the permit drawings Bedford’s building department needs. You decide the unit’s layout and whether it’s a studio or one-bedroom. This stage is paperwork and measuring, and it’s where budgets get honest.
Stage 2: Demo and shell prep (week 4)
Out comes the old garage door and track, the opener, and any shelving or built-ins. We frame the new exterior wall where the door used to be, cut in window and door openings, and address the slab. On 1960s – 80s Bedford garages the slab is often cracked or uneven from clay movement, so this is where a self-leveling pour or a raised subfloor gets decided.
Stage 3: Rough-in rough work (weeks 5 – 6)
Plumbing, electrical, and HVAC go in behind the walls. This is the heaviest decision point: a full bath with a shower needs a drain line tied back to the house, and if the main stack is far away, that’s real money. We walk you through running a new subpanel versus tapping the main panel, and where the mini-split or ducted system will live. Inspections happen before walls close.
Stage 4: Insulation, drywall, finish (weeks 7 – 11)
Closed-cell spray foam on the ceiling underside and exterior walls, then drywall, tape, and texture. Flooring, cabinets, countertops, fixtures, and paint follow. This is the longest stretch and the one you’ll notice most. A garage wall that faces the Texas sun needs more insulation than the house interior, and we spec accordingly.
Stage 5: Final inspections and punch (weeks 12 – 16)
Final building, electrical, plumbing, and mechanical sign-offs, then a walkthrough with you. Anything on the punch list gets closed before we call it done, and the work is covered under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
The difference between a $45,000 garage conversion and a $130,000 one usually isn’t square footage. It’s what you put inside it and how far the plumbing has to travel.
- Slab vs. raised subfloor: Patching and finishing the existing slab is the cheaper path, but if the concrete is cracked or the floor sits below grade, a raised subfloor with insulation runs more and stays warmer in winter.
- Bath configuration: A half bath with a toilet and sink costs far less than a full bath with a shower because the drain tie-in is simpler. If the unit is a rental, a full bath is usually what the market expects.
- Kitchenette vs. full kitchen: A sink, two-burner cooktop, and mini-fridge is a kitchenette. A full range and dishwasher pull more power and need more cabinet run. KraftMaid cabinetry holds up well in these tighter footprints.
- HVAC: A ductless mini-split is the usual pick for a single-room conversion. Ducting back to the main system only makes sense if the unit has multiple rooms.
- Exterior skin: Where the old garage door was, James Hardie siding blends the new wall into the house and handles North Texas heat and hail better than vinyl.
- Windows and light: Egress requirements push you toward at least one properly sized window. Adding more is a comfort decision, not a code one.
What a Garage Conversion ADU Costs in Bedford, TX

The honest range for Bedford is $45,000 – $130,000, with most single-car or two-car conversions landing between $60,000 and $95,000. The variables that move the number:
- Size and bay count: A one-car garage conversion is a studio. A two-car conversion can hold a one-bedroom with a full bath and kitchenette, which is what pushes a project up the range.
- Plumbing distance: The farther the new bath drain has to travel to the main stack, the more concrete gets cut. This is the single biggest wild card on a Bedford garage.
- Electrical service: A subpanel add is a known cost. Upgrading the main panel because the house is already maxed out is a bigger one.
- Slab condition: Expansive clay soils mean a cracked or settled slab on 1960s – 80s homes is common. Leveling or replacing adds cost.
- Finish grade: Builder-grade cabinets and laminate floors vs. Cambria counters and hardwood is a real spread.
A written estimate from us is line-item, with fixed pricing and no change orders for anything scoped. What it typically excludes: landscaping repair, any structural fix discovered once walls open, and appliance packages unless you ask for them.
See the difference
Before
After
Before
After
Before
AfterWhat Bedford Homes Specifically Do to This Job
Bedford is built out. There’s essentially no undeveloped land left in the mid-cities, so nearly every garage conversion here happens inside a 1960s – 80s tract home or ranch in ZIPs 76021 and 76022. That means the work runs through the city’s established permit and inspection process, not a greenfield subdivision approval. On the older stock, the failure modes are predictable: the garage slab has moved with the clay, the original wiring is undersized for the added load, and the garage shares a wall with the house that was never insulated. In the neighborhoods around Harwood Road and the Central Drive corridor, we routinely find slab cracks that need addressing before the floor goes down. Hail and summer heat also shape scheduling here, so exterior sheathing and roof patches get done in the cooler shoulder months when possible. For the wider scope of what an ADU addition can include, see our Home Additions & ADU in Bedford page. And homeowners often pair the conversion with a new driveway apron, which is where Concrete Driveways & Concrete Work in Bedford and Asphalt Driveways & Resurfacing in Bedford come in.
Serving Bedford, TX – Our Local Coverage Area
We serve Bedford and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Garage Conversion ADU in Bedford

Plan on 3 to 5 months from signed contract to final inspection. Permit review and the design set eat roughly the first three weeks, rough framing and mechanicals take another few, and finish work is the longest stretch. Weather and inspection timing can stretch the schedule, especially in spring hail season.
Yes. A garage conversion is a change of use and a habitable-space addition, so Bedford requires permits for building, electrical, plumbing, and mechanical, plus inspections at each stage. We pull the permits and manage the inspection schedule as part of the job. Converting without permits can void your insurance and create problems when you sell.
Sometimes. A studio with a kitchenette and half bath that sits near the existing house plumbing is the least invasive version. Any full bath with a shower usually needs a new drain line and a small amount of concrete work. The only way to know for certain is a site visit; our Home Additions & ADU team walks the garage with you and tells you straight.
Most Bedford projects land between $45,000 and $130,000 including finishes, with a typical one-bedroom conversion in the $60,000 – $95,000 range. The high end is a two-car garage with a full bath, full kitchen, and premium finishes. Call (855) 912-5373 for an exact quote; estimates are free.
Yes. Every garage conversion we build is backed by our 730-Day Done Right Promise. If something isn’t done right, we come back and make it right. Financing at 0% for 18 months is available, and projects over $10,000 get $1,000 off. We cover all of Bedford, including the ZIPs 76095, 76021, and 76022, alongside neighbors like Hurst and North Richland Hills on our Bedford service-area page.
Get a Free Garage Conversion ADU Estimate in Bedford
We’ll walk the garage, measure the slab, and check how your plumbing and panel are set up. You leave the visit with a written, line-item estimate in the $45,000 – $130,000 range for your specific job, no surprises, no vague allowances. A live person answers 24/7. Call (855) 912-5373 to schedule your free estimate for a garage conversion ADU in Bedford.