ADU Design & Permitting in Hurst, TX: What It Takes and What It Costs
Designing and permitting an ADU in Hurst runs $45,000 to $130,000 for the design-and-permit portion of a build, and the permitting phase alone usually takes 10 to 16 weeks from the first site survey to a stamped approval from the city. The design comes first, then the zoning and setback review, then structural and energy drawings, then the Hurst permit submittal and plan review. Most homeowners start with a feasibility study before they spend money on full drawings. Call (855) 912-5373 to schedule a free on-site estimate and we’ll walk your lot, check your setbacks, and tell you what’s actually buildable.
How ADU Design & Permitting Actually Unfolds, Stage by Stage

This isn’t a job you hand off and forget. The homeowner makes decisions at every stage, and a slow decision at stage two costs you weeks at stage five. Here’s the honest sequence.
Stage 1: Feasibility and Lot Survey (Week 1-2)
We walk the property, measure the lot, and pull the plat. In Hurst, most lots are tight, so the first question is always setbacks: how close can the ADU sit to the rear and side property lines, and does an existing detached garage or shed already eat the buildable envelope. You’ll decide here whether you’re converting something or building new. That single choice shapes everything downstream.
Stage 2: Schematic Design (Week 2-5)
We produce floor plans and elevations for the ADU: footprint, roofline, window placement, and how it meets the main house. You’ll pick the size here (a 500 sq ft studio versus a 750 sq ft one-bedroom changes the cost envelope by a wide margin) and decide whether to match the main house’s brick veneer or go with a contrasting siding. This is also where you settle the ADU’s kitchen and bath layout, because moving a bath wall later means re-drawing and re-submitting.
Stage 3: Structural, Energy, and Civil Drawings (Week 5-9)
Once the schematic is approved by you, we commission the structural engineering and the energy compliance documentation. Texas requires the energy calcs, and if a new driveway or utility trench crosses the lot, drainage documentation goes in too. This stage is where a slab-on-grade foundation gets specified against Hurst’s expansive clay, and that’s not a detail you skip. You’ll decide on foundation type and whether the ADU ties into the main house’s electrical panel or gets its own service.
Stage 4: Hurst Permit Submittal and Plan Review (Week 9-14)
We submit the full drawing set and permit application to the city. Plan review runs several weeks, and the city may come back with comments that require a correction cycle. We handle the corrections and the resubmittal. Some lots also trigger separate review for drainage or floodplain, which adds time. You’ll sign and pay the permit fees at this stage.
Stage 5: Permit Issued and Construction Ready (Week 14-16)
When the permit is in hand, you have a stamped, approved set of drawings ready for a builder to pull the construction permit and start work. If you’re building the ADU as part of a full Home Additions & ADU in Hurst project with us, this is where we roll straight into the build without a handoff.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Design and Specification Choices That Shape Your ADU
Every call here trades cost against durability, resale, or maintenance. There’s no single right answer, but there are some that fit Hurst better than others.
- Detached new build vs. garage conversion: A ground-up detached ADU gives you the cleanest design freedom but sits at the top of the range. A garage conversion is cheaper and faster but constrains layout to the existing footprint and often means fixing a slab that’s already moved.
- Foundation: slab-on-grade vs. pier-and-beam. Slab is standard and budget-friendly on the front end, though North Texas clay soils cause it to shift seasonally. Pier-and-beam costs more but tolerates movement better and lets you access plumbing later.
- Roofing: architectural asphalt vs. standing-seam metal. An architectural shingle from Tamko or a similar line is the economical choice and handles Hurst hail if you go impact-rated. Metal costs more up front but sheds hail and lasts longer, which matters when mature oaks drop limbs on the roof.
- Windows: single-hung vs. impact-rated. Impact-rated windows and doors cut energy bills in the Texas heat and protect against hail, but they add real cost. PGT and CGI both make impact-rated units that hold up here.
- Exterior cladding: brick veneer vs. fiber cement. Matching the main house’s brick blends the ADU in and helps with resale, but it’s pricier. Fiber cement is lighter, cheaper, and available in a wide color range.
- Utilities: tie-in vs. separate service. Tying the ADU to the main house’s panel is cheaper up front but may overload an older 1970s panel. A separate service costs more but keeps the systems independent, which matters if you ever rent the unit out.
What ADU Design & Permitting Costs in Hurst, TX

Design and permitting for an ADU in Hurst typically runs $45,000 to $130,000 for the design-through-permit scope. The wide range reflects how much the project asks of the drawings and the review.
A few variables push that number around, and each one is worth understanding before you sign:
- Size and complexity of the ADU. A small studio needs less drawing work than a two-bedroom with a full kitchen and laundry.
- Existing condition of the lot and any structure you’re converting. A garage with a cracked slab or missing utilities needs more engineering and inspection before conversion work can even begin.
- Relocating plumbing, electrical, or structure. Moving a bath wall or upgrading a panel adds engineering and triggers a longer review cycle.
- Material grade and specification. Impact-rated windows, metal roofing, and premium cladding all require more detailed drawings and add design time.
- Permit scope. Drainage, floodplain, or utility review on your specific lot adds review stages and fees.
A written estimate should spell out the drawing set, engineering costs, the permit submittal fee, and the plan-review timeline. What’s typically not included: the permit fees themselves (those go to the city, and we’ll tell you the amount before you sign), construction labor and materials, and any change orders triggered if you decide to enlarge the ADU after drawings are done. Upfront pricing, no surprises is the standard we hold to, and the 730-Day Done Right Promise backs the work from first drawing to final inspection.
See the difference
Before
After
Before
After
Before
AfterWhat Hurst Homes Specifically Do to This Job
Hurst sits in the heart of the DFW Mid-Cities, and the housing stock reflects it: the city is almost entirely built out, so a Hurst ADU project is nearly always squeezing a second structure onto a lot that a 1960s or 1970s brick-veneer ranch was designed for one house. The buildable envelope in a tight subdivision near the Airport Freeway (SH 183) corridor is the real constraint. We feel this most in ZIP codes 76053 and 76054, where mature pecan and oak trees hang over the rear fence line and cut into both the setback and the access a builder needs for materials.
Expansive clay soils shape the design too. Hurst slabs move seasonally, and an ADU foundation has to be engineered for that movement, not assumed. Spring hail storms mean the ADU roof and windows need impact-rated specs if you want them to last. And because Hurst runs its own inspections, we build the plan-review time into the schedule from the start rather than assuming the same timeline as nearby cities.
This is also where we lean on our Hurst service area knowledge and the licensed, insured trades who know the city’s review process. Homeowners often pair this with Paver Driveways in Hurst to give the ADU its own entry and turning space, and Chain Link Fence in Hurst to separate the ADU’s yard from the main house. For the wider scope, our Home Additions & ADU service covers everything from the planning stage to the final walkthrough.
Serving Hurst, TX – Our Local Coverage Area
We serve Hurst and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: ADU Design & Permitting in Hurst

Plan on 10 to 16 weeks from the first site survey to an issued permit. Feasibility and design take about four weeks, structural and energy drawings add another four, and Hurst plan review plus any correction cycle runs the last few weeks. Call (855) 912-5373 for a realistic timeline on your specific lot.
Yes. Hurst requires a permit for any new ADU or garage conversion, and the work has to pass city inspections before you can occupy it. Unpermitted work can create problems at resale and with insurance, so we build permitting into the scope from day one. Call (855) 912-5373 to schedule your free estimate.
Often yes, especially with a garage conversion where the existing plumbing and structure stay put. A conversion that keeps the bath and laundry in place is the fastest and least expensive path. The trade-off is layout: you may give up a bedroom or closet to fit the ADU’s bath and kitchen. Call (855) 912-5373 and we’ll tell you what your existing footprint supports.
Design and permitting for an ADU in Hurst runs $45,000 to $130,000, depending on size, existing conditions, utility relocations, material spec, and whether your lot triggers extra drainage or floodplain review. Call (855) 912-5373 for an exact quote – estimates are free.
Every ADU project we design and build is covered by the 730-Day Done Right Promise: if it’s not done right, we make it right. That covers workmanship from foundation to finish line. Call (855) 912-5373 for the full details on your project.
Get Your Free ADU Design & Permitting Estimate in Hurst
Start with a free on-site estimate. We walk your lot, check the setbacks against your buildable envelope, and tell you what Hurst permitting will actually require for your property. You’ll get a written, line-item estimate before any work begins. Calls are answered by a live person, 24/7, so you won’t wait until Monday to reach us. Call (855) 912-5373 to schedule yours.