A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Hurst, TX

ADU Site Prep & Utilities in Hurst - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Hurst, TX: What It Actually Involves

ADU Site Prep & Utilities in Hurst, TX runs $45,000 – $130,000 depending on how much trenching, re-grading, and utility relocation the lot demands, and most projects take six to twelve weeks from first shovel to first inspection sign-off. Site prep is the work that happens before framing: clearing and grading the pad, tying into water, sewer, gas, and electrical, and getting every underground inspection passed. Call (855) 912-5373 to schedule your free on-site estimate.

Call (855) 912-5373

How the Prep and Utilities Work Actually Happens, Step by Step

A remodeled family room with new windows and a window seat

Site prep isn’t one phase. It’s five, and each one closes out with a decision you make or a city inspector you pass.

Stage 1: Site survey and utility locate (days 1 – 2). We mark the buildable pad, run the 811 locate so we know exactly where the existing water and sewer laterals sit under the grass, and measure your setbacks against your lot line. In Hurst, where the ranch lots are tight, that measurement often decides where the ADU can legally sit before anything else gets a say. You confirm the footprint here.

Stage 2: Clearing, demo, and grading (days 3 – 6). Out comes the old shed, the struggling pecan stump, the concrete patio slab that’s been there a few decades. Then we grade to slope. On expansive clay this is the step that matters most, because you’re engineering drainage away from both the main house and the new pad. You pick the pad elevation at this stage.

Stage 3: Utility trenching and rough-in (days 7 – 12). Water, sewer, electrical conduit, gas if you’re running it, and any low-voltage get trenched and run to the pad. Sewer is the wildcard. If the existing lateral is shallow enough and the grade works, you tie in. If the ADU sits lower than the main drain line or the run crosses a big oak’s root zone, you’re looking at a lift pump or a longer re-route. You decide fixture locations now, before the pipe gets buried, because moving a toilet after backfill means tearing out slab.

Stage 4: Underground inspection and backfill (days 12 – 15). Hurst’s own city inspections sign off on the buried plumbing and electrical before a single yard of concrete covers it. We schedule this and walk you through what the inspector checked. You don’t have to be home, but you’ll get photos of the open trenches.

Stage 5: Pad pour, utility stubs, and handoff to structure (days 15 – 20). Final grade, form, and pour the slab or set the pier-and-beam foundation, with utility stubs left sticking up exactly where the build needs them. From there the site work is done and the ADU construction phase takes over. You approve the final grade and drainage plan before we pour.

That’s three weeks of the six-to-twelve-week window. Framing, finish, and final inspections eat the rest.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices That Actually Change Your Utility and Site Bill

  • Sewer tie-in vs. grinder pump. A gravity tie-in is the cheap, quiet, maintenance-free path. A grinder pump unlocks a pad elevation the grade wouldn’t otherwise allow in Hurst but adds equipment, a power drop, and eventual service. Choose gravity when the slope cooperates.
  • Concrete slab vs. pier-and-beam pad.Slab is standard on the flat Mid-Cities lots and keeps costs down. Pier-and-beam costs more upfront but gives you access to plumbing under the floor and handles the seasonal clay movement better. On an expansive-clay lot, that access is worth considering.
  • Electrical service size. A 60-amp subpanel runs lights, outlets, and a mini-split fine. A 100-amp or 200-amp service costs more but leaves room for a full kitchen, EV charging, or a heat-pump water heater later. Size it for the ADU you might want, not just the one you’re building.
  • Trench depth and conduit quality. Deeper conduit in rigid PVC holds up and satisfies inspection cleanly; thinner flexible line is cheaper and more vulnerable to root intrusion over time.
  • Water lateral material. PEX and copper both work. PEX is faster to install and cheaper; copper has a longer service life but more cost and a slower run. Most Hurst jobs go PEX.
  • Drainage and grading extras. A simple slope and swale is baseline. A French drain or catch basin on the low side of the lot is an add, and it’s the difference between a dry ADU foundation and a wet one after a spring storm.

What ADU Site Prep & Utilities Costs in Hurst, TX

A framer checking new wall framing on a home addition

For site prep and utilities specifically, expect $45,000 – $130,000. That range is wide because the variables that move it are genuinely wide, and the ADU structure that follows sits on top of it. (Full ADU construction including the build runs $90,000 – $220,000, which is a separate number.)

What pushes a job to the low end versus the high end:

  • Lot and grading condition. A flat, cleared lot grades fast. A lot with mature tree roots, an old slab to remove, or a slope that needs retaining work pushes toward the top.
  • Utility run distance. An ADU 30 feet from the existing sewer line costs far less than one 80 feet out with a re-route around a root zone.
  • Sewer solution. Gravity tie-in is cheap. A grinder pump, lift station, or long re-route is an add.
  • Electrical service size and trench length. 60-amp at short distance is the floor. 200-amp with a long conduit run and a new meter is toward the ceiling.
  • Permit scope and inspections. Every underground and grading inspection you have to pass adds time and fee. The city sets those, not us.

Your written line-item estimate breaks out grading, trenching, each utility trade, inspection fees, and the pad pour. It excludes the ADU structure itself and any HOA fees you may owe. Upfront pricing, no surprises: the number you see is the number you pay, backed by the 730-Day Done Right Promise.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hurst’s Built-Out, Mid-Century Lots Do to This Job

Hurst is a built-out inner-ring suburb, and almost everything we do here is work on 1960s – 1980s brick-veneer ranches on tight subdivision lots in ZIP codes 76053 and 76054. There’s no fresh lot to grade; you’re fitting an ADU onto a lot that’s already fully used. That’s where the real Hurst-specific problems live.

The mature pecan and oak canopies that hang over these properties are the first. Roots run far beyond the trunk line, so a sewer or water trench has to either find a route around them or accept the cost of cutting through, and the city cares about tree health in the process. Second, those same trees and the seasonal movement in North Texas clay make drainage the make-or-break decision on Hurst pads; a poorly graded pad on expansive soil will heave and crack. Third, Hurst’s own city inspections are the gatekeeper on every underground, and inspections here are scheduled, not rushed. Tight lot lines in the established neighborhoods mean setbacks and utility easements do most of the deciding on where the ADU can sit before you ever pick a floor plan. We work in Hurst constantly and know how the inspections and permits flow. It’s part of our Home Additions & ADU in Hurst work, and site prep is where we start every one.

Serving Hurst, TX – Our Local Coverage Area

We serve Hurst and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Site Prep & Utilities in Hurst

A new front yard fence with a matching gate

Get Your Hurst ADU Ready Before the Build Starts

Site prep decides how smooth the rest of your ADU project goes. Call (855) 912-5373 to schedule a free on-site estimate in Hurst. We’ll walk your lot, measure the setbacks, look at the utility laterals, and hand you a written line-item estimate for the grading, trenching, and pad work. A live person answers around the clock. Most Hurst properties we see here pair the pad work with a fresh approach, and homeowners often combine it with Paver Driveways in Hurst or a Concrete Driveways & Concrete Work in Hurst to finish the access route. It’s all part of our Home Additions & ADU capability across Hurst.

Written by the team at Groundwork Construction Co.

Why Hurst Chooses Groundwork Construction Co. of Fort Worth

We set the standard for ADU site prep & utilities in Hurst.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hurst

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hurst Customers Say

Trusted by homeowners across Hurst and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinets

More services in Hurst

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Hurst?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hurst.

(855) 912-5373

Request a Free Estimate in Hurst

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch