A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Hurst, TX

ADU Design & Permitting in Hurst - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Hurst, TX: What It Takes and What It Costs

Designing and permitting an ADU in Hurst runs $45,000 to $130,000 for the design-and-permit portion of a build, and the permitting phase alone usually takes 10 to 16 weeks from the first site survey to a stamped approval from the city. The design comes first, then the zoning and setback review, then structural and energy drawings, then the Hurst permit submittal and plan review. Most homeowners start with a feasibility study before they spend money on full drawings. Call (855) 912-5373 to schedule a free on-site estimate and we’ll walk your lot, check your setbacks, and tell you what’s actually buildable.

Call (855) 912-5373

How ADU Design & Permitting Actually Unfolds, Stage by Stage

A remodeled family room with new windows and a window seat

This isn’t a job you hand off and forget. The homeowner makes decisions at every stage, and a slow decision at stage two costs you weeks at stage five. Here’s the honest sequence.

Stage 1: Feasibility and Lot Survey (Week 1-2)

We walk the property, measure the lot, and pull the plat. In Hurst, most lots are tight, so the first question is always setbacks: how close can the ADU sit to the rear and side property lines, and does an existing detached garage or shed already eat the buildable envelope. You’ll decide here whether you’re converting something or building new. That single choice shapes everything downstream.

Stage 2: Schematic Design (Week 2-5)

We produce floor plans and elevations for the ADU: footprint, roofline, window placement, and how it meets the main house. You’ll pick the size here (a 500 sq ft studio versus a 750 sq ft one-bedroom changes the cost envelope by a wide margin) and decide whether to match the main house’s brick veneer or go with a contrasting siding. This is also where you settle the ADU’s kitchen and bath layout, because moving a bath wall later means re-drawing and re-submitting.

Stage 3: Structural, Energy, and Civil Drawings (Week 5-9)

Once the schematic is approved by you, we commission the structural engineering and the energy compliance documentation. Texas requires the energy calcs, and if a new driveway or utility trench crosses the lot, drainage documentation goes in too. This stage is where a slab-on-grade foundation gets specified against Hurst’s expansive clay, and that’s not a detail you skip. You’ll decide on foundation type and whether the ADU ties into the main house’s electrical panel or gets its own service.

Stage 4: Hurst Permit Submittal and Plan Review (Week 9-14)

We submit the full drawing set and permit application to the city. Plan review runs several weeks, and the city may come back with comments that require a correction cycle. We handle the corrections and the resubmittal. Some lots also trigger separate review for drainage or floodplain, which adds time. You’ll sign and pay the permit fees at this stage.

Stage 5: Permit Issued and Construction Ready (Week 14-16)

When the permit is in hand, you have a stamped, approved set of drawings ready for a builder to pull the construction permit and start work. If you’re building the ADU as part of a full Home Additions & ADU in Hurst project with us, this is where we roll straight into the build without a handoff.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Specification Choices That Shape Your ADU

Every call here trades cost against durability, resale, or maintenance. There’s no single right answer, but there are some that fit Hurst better than others.

  • Detached new build vs. garage conversion: A ground-up detached ADU gives you the cleanest design freedom but sits at the top of the range. A garage conversion is cheaper and faster but constrains layout to the existing footprint and often means fixing a slab that’s already moved.
  • Foundation: slab-on-grade vs. pier-and-beam. Slab is standard and budget-friendly on the front end, though North Texas clay soils cause it to shift seasonally. Pier-and-beam costs more but tolerates movement better and lets you access plumbing later.
  • Roofing: architectural asphalt vs. standing-seam metal. An architectural shingle from Tamko or a similar line is the economical choice and handles Hurst hail if you go impact-rated. Metal costs more up front but sheds hail and lasts longer, which matters when mature oaks drop limbs on the roof.
  • Windows: single-hung vs. impact-rated. Impact-rated windows and doors cut energy bills in the Texas heat and protect against hail, but they add real cost. PGT and CGI both make impact-rated units that hold up here.
  • Exterior cladding: brick veneer vs. fiber cement. Matching the main house’s brick blends the ADU in and helps with resale, but it’s pricier. Fiber cement is lighter, cheaper, and available in a wide color range.
  • Utilities: tie-in vs. separate service. Tying the ADU to the main house’s panel is cheaper up front but may overload an older 1970s panel. A separate service costs more but keeps the systems independent, which matters if you ever rent the unit out.

What ADU Design & Permitting Costs in Hurst, TX

A framer checking new wall framing on a home addition

Design and permitting for an ADU in Hurst typically runs $45,000 to $130,000 for the design-through-permit scope. The wide range reflects how much the project asks of the drawings and the review.

A few variables push that number around, and each one is worth understanding before you sign:

  • Size and complexity of the ADU. A small studio needs less drawing work than a two-bedroom with a full kitchen and laundry.
  • Existing condition of the lot and any structure you’re converting. A garage with a cracked slab or missing utilities needs more engineering and inspection before conversion work can even begin.
  • Relocating plumbing, electrical, or structure. Moving a bath wall or upgrading a panel adds engineering and triggers a longer review cycle.
  • Material grade and specification. Impact-rated windows, metal roofing, and premium cladding all require more detailed drawings and add design time.
  • Permit scope. Drainage, floodplain, or utility review on your specific lot adds review stages and fees.

A written estimate should spell out the drawing set, engineering costs, the permit submittal fee, and the plan-review timeline. What’s typically not included: the permit fees themselves (those go to the city, and we’ll tell you the amount before you sign), construction labor and materials, and any change orders triggered if you decide to enlarge the ADU after drawings are done. Upfront pricing, no surprises is the standard we hold to, and the 730-Day Done Right Promise backs the work from first drawing to final inspection.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Hurst Homes Specifically Do to This Job

Hurst sits in the heart of the DFW Mid-Cities, and the housing stock reflects it: the city is almost entirely built out, so a Hurst ADU project is nearly always squeezing a second structure onto a lot that a 1960s or 1970s brick-veneer ranch was designed for one house. The buildable envelope in a tight subdivision near the Airport Freeway (SH 183) corridor is the real constraint. We feel this most in ZIP codes 76053 and 76054, where mature pecan and oak trees hang over the rear fence line and cut into both the setback and the access a builder needs for materials.

Expansive clay soils shape the design too. Hurst slabs move seasonally, and an ADU foundation has to be engineered for that movement, not assumed. Spring hail storms mean the ADU roof and windows need impact-rated specs if you want them to last. And because Hurst runs its own inspections, we build the plan-review time into the schedule from the start rather than assuming the same timeline as nearby cities.

This is also where we lean on our Hurst service area knowledge and the licensed, insured trades who know the city’s review process. Homeowners often pair this with Paver Driveways in Hurst to give the ADU its own entry and turning space, and Chain Link Fence in Hurst to separate the ADU’s yard from the main house. For the wider scope, our Home Additions & ADU service covers everything from the planning stage to the final walkthrough.

Serving Hurst, TX – Our Local Coverage Area

We serve Hurst and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Design & Permitting in Hurst

A remodeled kitchen with a waterfall island and wood cabinets

Get Your Free ADU Design & Permitting Estimate in Hurst

Start with a free on-site estimate. We walk your lot, check the setbacks against your buildable envelope, and tell you what Hurst permitting will actually require for your property. You’ll get a written, line-item estimate before any work begins. Calls are answered by a live person, 24/7, so you won’t wait until Monday to reach us. Call (855) 912-5373 to schedule yours.

Written by the team at Groundwork Construction Co.

Why Hurst Chooses Groundwork Construction Co. of Fort Worth

We set the standard for ADU design & permitting in Hurst.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hurst

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hurst Customers Say

Trusted by homeowners across Hurst and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Hurst

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Hurst?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hurst.

(855) 912-5373

Request a Free Estimate in Hurst

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch