A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Hurst, TX

New Detached ADU in Hurst - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Hurst, TX: What It Takes, What It Costs

A new detached ADU in Hurst, TX runs $45,000 to $130,000 and typically takes 5 to 8 months from the first site walk to final inspection. The wide spread comes down to size, whether you’re bringing utilities out from the main house, and how far you push the finish level. Our technicians have up to 12 years of experience building detached units on the tight, mature lots that define this part of the Mid-Cities. Call (855) 912-5373 to schedule a free on-site estimate and we’ll put a real number to your backyard.

Call (855) 912-5373

Your Builder Cut Corners on the Garage Door – Here’s How That Same Story Shapes an ADU

A second-story addition that matches the existing roofline

If you bought in one of Hurst’s newer pockets or a master-planned stretch to the north, you already know the pattern. The builder-grade overhead door on your attached garage was spec’d to pass inspection, not to last. Thin steel, a single-layer opener motor that groans in July, no insulation against the North Texas heat, and a Wi-Fi module the original buyer likely never added. That’s the same builder logic that follows homeowners into every other “add a structure” conversation around here.

It matters for an ADU because the same house that got a cheap garage door typically also got:

  • Undersized or barely-there attic insulation rather than a proper R-value barrier
  • A slab that was poured to spec but never regraded for drainage
  • An exterior weather barrier that’s fine until someone starts trenching utilities for a detached structure

So when we walk a Hurst lot for a detached ADU, we’re not just measuring a footprint. We’re checking what the original build left you, and we’re planning around it. That’s why our written line-item estimate accounts for the corrective work up front instead of surprising you mid-framing. Call (855) 912-5373 to schedule the site walk – the estimate is free and there’s no obligation.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

How We Build a New Detached ADU in Hurst, Stage by Stage

Here’s the real sequence. It’s not “we handle everything.” It’s a set of decisions and inspections with a calendar attached.

Stage 1 – Site walk and feasibility (1 to 2 weeks). We measure your lot, check setbacks against Hurst’s city requirements, and confirm utility routes from the main house. You decide: target square footage, footprint shape, and whether you want a full kitchen or a kitchenette. This is where we find out if mature trees are in the way – and in Hurst, they often are.

Stage 2 – Design and permitting (4 to 10 weeks). Plans get drawn, then submitted. Hurst runs its own city inspections, and the permitting window is the single biggest variable in your overall timeline. You approve the final drawing set and finish selections locked to a written scope. No change orders later means your choices get frozen here.

Stage 3 – Site prep and foundation (1 to 2 weeks). Utility trenching from the main house, grading for drainage, and a slab or pier-and-beam foundation. On Hurst’s expansive clay, foundation type is a real decision with a real cost gap. You confirm the foundation engineer’s recommendation before we pour.

Stage 4 – Framing, mechanicals, and envelope (6 to 10 weeks). Framing, rough-in plumbing and electrical, insulation, roof, and exterior siding. Inspections happen at frame and rough-in. This is the stage where we hold the schedule to the closed permit.

Stage 5 – Finishes and final inspection (4 to 6 weeks). Cabinets, counters, flooring, fixtures, paint, and the final city walk. You do your punch walk before we book the last inspection. That’s the full arc: 5 to 8 months on a typical detached unit.

The Options You’ll Choose Between on a Detached ADU

A framer checking new wall framing on a home addition

Most of the cost swing lives in these choices, not in the square footage:

  • Foundation – slab vs. pier-and-beam. Slab is cheaper and simpler. Pier-and-beam handles Hurst’s clay better on some lots and gives you access to plumbing. The trade-off is upfront cost against long-term movement.
  • Siding – fiber cement vs. brick veneer to match. Fiber cement like James Hardie holds paint and weathers hail better; brick veneer matches the Hurst ranch aesthetic and lasts forever but costs more. We walk you through both against your main house.
  • Kitchen – full vs. kitchenette. A full kitchen with cabinets, a real range, and plumbing is the ADU rental driver. A kitchenette saves roughly the cabinet and appliance cost and suits a family-use or guest setup.
  • Cabinetry grade. KraftMaid and Wellborn both hold up; the difference is door style, finish durability, and lead time. You feel it in the daily-use areas.
  • Insulation and HVAC. Builder-grade R-value vs. an upgraded envelope. The upgrade costs more now and pays back in a detached unit’s cooling bill through a Hurst summer.
  • Roofing. Impact-rated shingles against a standard grade. Worth asking about given the spring hail here.

We carry a curated portfolio of brands across every trade, so you choose quality, not just availability. Call (855) 912-5373 for the design consult and we’ll price your two or three real options side by side.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What a New Detached ADU Costs in Hurst, TX

The lead range is $45,000 to $130,000. Where a project lands inside it comes down to four or five things:

  • Size. A 400 sq ft studio sits at the low end; an 800 to 900 sq ft one-bedroom with a full kitchen lands toward the top.
  • Utility run distance. Trenching water, sewer, and electrical from the main house is a per-foot cost. A backyard facing the alley is cheaper than a long run through mature trees.
  • Foundation and site work. Clay soil and mature root systems can push the foundation line.
  • Finish grade. Cabinets, counters, fixtures, and flooring together can swing tens of thousands depending on what you pick.
  • Permit scope. A full kitchen with a range and a full bath means more inspection phases than a wet-bar setup.

Your written estimate includes framing, foundation, mechanicals, insulation, roofing, siding, interior finishes, and the permit pull. What it typically does NOT include: landscape repair after trenching, furniture, and any HOA fees. Upfront pricing means the number you see is the number you pay. All projects carry our 730-Day Done Right Promise – if it’s not done right, we make it right. Call (855) 912-5373 for an exact quote – estimates are free.

What Hurst Homes Specifically Do to This Job

A galley kitchen opened up to the dining room with a new peninsula

Hurst is a mostly-built-out inner-ring suburb in the DFW Mid-Cities. Nearly all construction work here is remodel, addition, and repair on 1960s to 1980s brick-veneer ranches on tight subdivision lots, not new build. That changes a detached ADU in two specific ways. First, setback compliance is tight – those old lots were platted narrow, and a detached unit has to fit inside a squeezed side and rear yard. Second, mature pecan and oak canopies hang over the roof and fence lines on the older ranch lots in the 76053 and 76054 ZIPs, so limb damage risk and tight access for equipment are routine. Newer Mid-Cities subdivisions to the north don’t have this problem, and contractors who mostly work new build don’t plan for it.

Then there’s the clay. North Texas expansive clay means slabs move seasonally, so we account for drainage and regrading before we pour anything. And because Hurst runs its own city inspections, the permitting window drives the whole schedule – see our Home Additions & ADU in Hurst page for the broader scope. Our technicians have up to 12 years of experience navigating this. If tree removal or regrading around the new structure is part of the plan, homeowners often pair this with Concrete Driveways & Concrete Work in Hurst for access and drainage work. We cover the full Hurst area. Pairing a paver walkway from the main house to the unit is common too – that’s our Paver Driveways in Hurst work. From foundation to finish line, it’s one contractor.

Promotions on the table

We offer a free project estimate and design consult, 0% financing for 18 months, and $1,000 off projects over $10,000. Calls get answered by a live person, 24/7 – no voicemail, no waiting until Monday. Technicians are background-checked and arrive in uniform. If your scope grows into a broader detached structure plan, our Home Additions & ADU service covers the wider picture.

Serving Hurst, TX – Our Local Coverage Area

We serve Hurst and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Hurst

Ready to Price Your Detached ADU in Hurst?

Call (855) 912-5373 to schedule your free on-site estimate. We’ll measure the lot, confirm setbacks, walk the utility route, and hand you a written line-item quote with the real options priced out. No hype, no surprise change orders – just a number you can plan around. Built to last, backed in writing.

Written by the team at Groundwork Construction Co.

Why Hurst Chooses Groundwork Construction Co. of Fort Worth

We set the standard for new detached ADU in Hurst.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hurst

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hurst Customers Say

Trusted by homeowners across Hurst and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted walls

More services in Hurst

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Hurst?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Hurst.

(855) 912-5373

Request a Free Estimate in Hurst

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch