Concrete Driveways & Concrete Work in Richland Hills, TX: What It Costs and How Long It Takes
Concrete driveways and concrete work in Richland Hills typically run $4,500 – $12,000 for a new driveway pour, and most residential slabs are finished in 3 to 5 days from demo to cure. A replacement runs $5,000 – $14,000. The schedule is driven by prep and grading, not the pour itself. Call (855) 912-5373 and we’ll walk your lot and give you a written, line-item number before anything gets torn out.
How concrete driveway work actually runs, stage by stage

People picture a truck backing up and dumping mud. Most of the job happens before that, and the prep is what decides whether the slab cracks in year two or holds for thirty.
Day 1: Layout, utility locate, and demo
We stake the driveway edges and confirm the width you actually want, taking into account where you park and how wide your truck or trailer is. Before a single shovel goes in, the 811 locate gets called so we know where the gas, water, and sewer lines sit. Then the old slab or the grass and topsoil comes out. On a standard two-car drive, demo and haul-off takes a full day. You decide the layout and the slope direction at this stage, because once it’s poured, that decision is permanent.
Day 1 – 2: Subgrade prep and base
We excavate to depth, compact the subgrade, and bring in a graded base. In Richland Hills the clay under a lot can hold moisture and heave, so the base build and drainage plan get more attention here than they do on sandier ground. This is a two- to four-inch base under a residential slab, compacted in lifts. If the soil is wet or soft, we over-excavate and replace it rather than pour over a problem. You decide here whether to add a thickened edge for heavier loads.
Day 2 – 3: Formwork, rebar, and inspection
Forms go up to the final grade and the slope that sheds water away from the house. Rebar or mesh gets tied and set on chairs so it sits in the middle of the slab, not on the dirt. If the scope requires a permit, the inspection happens at this point, before the pour. Skipping this stage is how contractors save a day and how slabs fail.
Day 3: The pour
The truck arrives, the concrete gets placed and screeded to the forms, and the crew floats and trowels it to your chosen finish. A standard driveway is a broom finish for traction and takes a few hours to place and finish. A decorative finish adds time, and air-entrained mix is specified for freeze-thaw resilience. You choose the finish and any control-joint layout before the truck shows up, not during.
Day 4 – 5: Cure and cut
Control joints get cut within 24 hours to direct where the slab cracks. Curing takes about 7 days of keeping it damp or covered, and you should keep vehicles off it for roughly a week. Full cure runs 28 days. We walk the finished slab with you and confirm the joints, edges, and drainage before we call it done, all covered under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The concrete options you’ll choose between
Most of the decisions on this job come down to four choices, and each one trades cost against durability or looks.
- Standard broom-finish slab ($4,500 – $12,000): the workhorse driveway. Broom texture grips wet tires and shoes, it’s the least expensive finish, and it’s the easiest to repair in a matched patch later if it ever needs one.
- Exposed aggregate: a textured, pebbled surface that hides tire marks and looks richer than broom. It costs more and is rougher underfoot, so it suits a driveway more than a walkway a toddler runs on.
- Reinforcement – rebar vs. mesh: rebar tied on chairs is the stronger choice over expansive North Texas clay because it holds the slab together when the soil shifts. Mesh is cheaper and works on light-duty slabs. We recommend the stronger option on anything that takes vehicle weight.
- Thickness – 4″ standard vs. 5″ – 6″ heavy-duty: a 4-inch slab handles cars and pickups fine. If a workshop driveway, a boat trailer, or an RV pulls in, the slab gets thicker and gets a heavier base. Sakrete or Quikrete bagged mixes are fine for small repairs, but a driveway pour is delivered readymix, not bags.
What concrete driveways and concrete work cost in Richland Hills, TX

The number for a new concrete driveway here lands between $4,500 and $12,000, and a full replacement runs $5,000 – $14,000 when old concrete has to come out and get hauled. Five things move that number:
- Size and thickness: a single-car pad versus a long double-wide drive is the biggest swing. Area and slab thickness set the concrete volume, and volume is most of the material cost.
- Demo and haul-off: breaking out and disposing of an existing slab adds cost and a day. No old slab, no demo line.
- Soil and grading: over-excavating soft clay, bringing in base, or correcting a slope that drains toward the house adds work. A lot that already grades away from the house is cheaper.
- Finish and detail: broom is the baseline; exposed aggregate and decorative add cost. If you want a stamped or paver look, that’s a different job – see Driveway & Pavers in Richland Hills for the wider project scope.
- Permit scope and any utility conflict: relocation of a water line or a driveway that crosses a utility easement adds cost and inspection time.
Your written estimate itemizes concrete volume, base, rebar, finish, demo, and disposal, so the number you see is the number you pay. What it won’t include are surprises you didn’t ask for: a hot tub pad, a shed slab, or extra drainage. We’ll price those separately if you want them, and there’s no change-order scramble once the work starts.
See the difference
Before
After
Before
After
Before
AfterWhat Richland Hills lots specifically do to a concrete job
Richland Hills is an inner-ring Fort Worth suburb in ZIP 76118, built out mostly in the 1950s through the 1970s. That means most of the concrete work here is tear-out and replacement on postwar slabs, not fresh pours on new lots. The shrink-swell clay across Richland Hills and neighboring Haltom City moves with our drought-and-rain cycles, and that movement is what cracks old driveways and tilts them toward the garage. When we cut out a 1960s drive along a street off the Haltom City side, we often find thin, unreinforced concrete poured over bare dirt, with no base and no control joints. That explains the spiderweb cracking and the low spot at the garage door you’ve been living with. Tight lots and setbacks in this built-out city mean a wider driveway has to be planned around the existing foundation and drainage, and the city’s permit and inspection process runs alongside the work. North Texas hail season doesn’t touch concrete, but the same storms that risk your roof get the driveway’s drainage plan right, so water runs off, not into the slab. That’s the kind of local know-how behind every job we do across Richland Hills.
Serving Richland Hills, TX – Our Local Coverage Area
We serve Richland Hills and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Concrete Driveways & Concrete Work in Richland Hills

A typical residential concrete driveway in Richland Hills takes 3 to 5 working days from demo to finished cure, then about 7 days before you drive on it and 28 days to full strength. Call (855) 912-5373 for a schedule based on your specific lot.
Sometimes, depending on the scope. A straightforward replacement on an existing footprint is often exempt, but new construction, a change in the driveway’s width or location, or work near a utility easement can require a permit and inspection. We confirm what your project needs before we start and pull the permits when they’re required.
In most cases, yes. We call the locate service before any digging, and if the existing lines sit deep enough, they stay where they are. When a utility runs shallow across the driveway path, we adjust the slab plan or relocate – that’s a decision made during prep, not after the pour.
No, not for the scope in your signed estimate. Our upfront pricing is the number you see. If we uncover soft clay or a hidden conflict that wasn’t visible, we’ll stop, explain it, and get your approval before any extra cost. That’s how the 730-Day Done Right Promise works.
Every concrete driveway we pour is covered by our 730-Day Done Right Promise. If the workmanship isn’t right, we make it right. Call (855) 912-5373 to talk through your project and get a free written estimate.
Get a free concrete driveway estimate in Richland Hills
We’ll come out, walk the lot, check the grade and the existing slab, and leave you with a written line-item estimate for concrete driveways and concrete work in Richland Hills – no pressure, no surprise add-ons. Calls are answered by a live person around the clock, and our technicians are background-checked and in uniform. Call (855) 912-5373 for your free estimate. If your project grows, homeowners often pair a new drive with ADU Site Prep & Utilities in Richland Hills or Door Installation in Richland Hills, and we’ll price it all in one pass. For the full scope of our Driveway & Pavers work, that’s where to start.
Written by the team at Groundwork Construction Co.