A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Fort Worth, TX

New Detached ADU in Fort Worth - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Fort Worth: What It Costs and How Long It Takes

A new detached ADU in Fort Worth typically runs $45,000 – $130,000 and takes 4 – 7 months from survey to final inspection. That range covers a standalone structure with its own foundation, utility connections, and full finishes, not a converted garage or an attached addition. Most of the 4 – 7 months is permitting and inspection time, not hammer-and-nail time. Call (855) 912-5373 to schedule a free on-site estimate and get a written line-item quote for your lot.

Call (855) 912-5373

How We Build a Detached ADU, Stage by Stage

A remodeled family room with new windows and a window seat

The sequence for a new detached ADU in Fort Worth runs in five stages. Each one has a decision point where you sign off before the next stage starts. Missing or late decisions are the single biggest cause of schedule slips on ADU work, so we put them front and center.

Stage 1: Site evaluation and design (2 – 3 weeks)

We walk the lot, confirm setbacks, check where the main sewer line and electrical panel actually sit, and verify what access there is for equipment. You decide the footprint and where the unit sits relative to your house, driveway, and existing trees. From there, drawings go out for engineer review and then to the city. Expect 2 – 3 weeks before a permit application is submitted.

Stage 2: Permitting and city review (4 – 10 weeks)

This stage moves at the city’s pace, not ours. Plan review, platting questions, utility tap coordination, and any zoning overlay all have to clear. You decide nothing here except whether to accept any plan-review revisions the city requests (usually minor, occasionally a footprint change). This is where a Fort Worth ADU is won or lost on schedule, so we build the review timeline into the written estimate up front instead of discovering it mid-build.

Stage 3: Site prep, foundation, and utilities (3 – 4 weeks)

We clear the footprint, rough-grade, and pour the foundation. On Fort Worth’s expansive black clay, that means engineered slab or pier-and-beam sized for soil movement rather than frost, and we plan utility trenches for electrical, water, sewer, and gas runs from the main house in the same window so the ground only gets opened once. You decide which utility runs get extended and whether a separate meter is worth it for tenant billing.

Stage 4: Framing, dry-in, and rough trades (4 – 6 weeks)

Framing, sheathing, roof, and windows go up first so the structure is dried in before interior rough work. Then plumbing, electrical, and HVAC rough-in get inspected together in one pass. You decide window and door locations one last time here, because moving an opening after framing is a real cost. Roofing and exterior finish go on this stage too. For exterior finish choices that tie the ADU to the main house, this is the moment.

Stage 5: Finishes, final inspections, and handoff (4 – 6 weeks)

Insulation, drywall, flooring, cabinets, fixtures, and trim all get installed. Final inspection covers electrical, plumbing, mechanical, and building. You decide finishes at the start of this stage, not the middle, because cabinet and fixture lead times can stall the punch list. Once inspections pass, we walk the unit with you, hand over warranties and manuals, and the ADU is rentable or habitable.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make on an ADU Build

Most ADU decisions come down to a handful of trade-offs. Here’s what actually matters and how each choice holds up in North Texas conditions.

  • Slab vs. pier-and-beam foundation: Slab is faster and cheaper up front and standard on new construction. Pier-and-beam costs more but forgives the soil movement Fort Worth’s black clay is famous for. On an ADU where the soil is expansive and water drainage is tricky, the added cost is often worth it.
  • Frame-built vs. modular delivery: Site-built framing gives you exact control over footprint and tie-in to the main house. Modular sections arrive faster but are locked into manufacturer dimensions and often cost more per square foot once delivery and crane fees are added.
  • Roofing material: Architectural asphalt shingles (Tamko makes a solid line) are the standard and handle hail well. Metal costs more but handles long summer sun and wind better and lowers cooling load. On a 400 – 800 sq ft ADU roof, the premium for metal is usually under the cost of one replacement.
  • Exterior finish: Hardie fiber-cement siding, stucco, and brick veneer all work. In Fort Worth where afternoon sun is brutal, fiber-cement and stucco hold color better than wood.
  • Windows: PGT and CGI both make impact-rated lines that meet Texas wind requirements and cut summer heat gain. Impact glass costs more up front but lowers insurance on the ADU and lasts far longer than single- or double-pane on a sun-facing wall.
  • HVAC: A mini-split is cheaper to install and cheaper to run in a small space. A full ducted system is better if the unit will be lived in full-time rather than occasionally rented.
  • Kitchenette and bath finishes: A compact galley kitchen and a walk-in shower are the two finishes that drive rental value the most. Overspending on fixtures rarely pays back on an ADU; underspending on waterproofing always costs you.

New Detached ADU Cost in Fort Worth, TX

A framer checking new wall framing on a home addition

A new detached ADU in Fort Worth generally lands between $45,000 and $130,000. That’s the range from a compact studio-style unit to a full one-bedroom with a kitchen and bath. The number you see in the written estimate is the number you pay; we lock line items before work begins so no change orders appear mid-build.

Five variables push a job from the low end to the high end:

  • Size and layout: A 400 sq ft studio sits at the bottom of the range. A 900 sq ft one-bedroom tops it out.
  • Site conditions: A flat, accessible lot is easy. A lot with a slope, a dense tree canopy, or a long utility run from the main house adds cost.
  • Utility extensions: Extending water, sewer, gas, and power from the main house is a fixed cost per linear foot. A unit placed 60 feet from the house costs more than one placed 20 feet away.
  • Foundation type and soil: Expansive clay may require a more heavily engineered slab or pier-and-beam foundation. That’s typically a 5 – 10% lift on total cost.
  • Materials and finishes: Metal roof, impact windows, and full kitchen cabinetry push to the high end. Standard shingle and a kitchenette drop to the low end.

What’s included in a written estimate: design coordination with the engineer, permit submission and city fees, foundation, framing, all utility rough-ins and taps, roofing, exterior finish, insulation, drywall, flooring, electrical, plumbing, HVAC, finish carpentry, and final inspections. What’s typically not included: landscaping around the finished structure, furniture, tenant improvements beyond the agreed scope, and any easement or platting fees the city assesses separately, which we flag upfront when they apply.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Fort Worth Homes Do to a Detached ADU Build

Fort Worth builds on two speeds. On one permit you’re working a historic-district lot in Fairmount or Ryan Place with design-review overlays and pier-and-beam foundations sitting on true-dimension lumber. On the next permit you’re framing slab-on-grade in the fast-growing northwest toward Alliance, or past Loop 820 into tracts where the neighborhood was a hayfield 18 months ago. That spread is what makes Fort Worth different from Dallas, which is denser, more vertical and infill-locked. Here the land is still cheap enough to build new, and the culture still patches up what’s old.

Two conditions drive every ADU we build here: North Texas heat and the expansive black clay soil. Foundation engineering is sized for soil movement, not freeze depth. Roofing and exterior specs run toward hail and straight-line wind resistance. Summer build windows are aggressive because heat slows the trades. The historic districts add their own layer: even a straightforward standalone structure on a Ryan Place or near-Stockyards lot can stall on a design-review overlay before the building permit moves. Crews pulling permits here learn fast that what passes in a new subdivision won’t pass on a 1920s bungalow block.

Serving Fort Worth, TX – Our Local Coverage Area

We serve Fort Worth and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: New Detached ADU in Fort Worth

A new concrete driveway with a paver border

Schedule a Free On-Site ADU Estimate in Fort Worth

A free estimate for a new detached ADU in Fort Worth starts with a call to (855) 912-5373. We visit the lot, measure setbacks and utility runs, and talk through the footprint and finishes you have in mind. That call is free, and so is the written line-item quote you get from it. If you’re weighing a full addition against an ADU, or pairing the new structure with driveway work, we’ll scope both on the same visit. Call today to get on the schedule.

Written by the team at Groundwork Construction Co.

Why Fort Worth Chooses Groundwork Construction Co. of Fort Worth

We set the standard for new detached ADU in Fort Worth.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Fort Worth

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Fort Worth Customers Say

Trusted by homeowners across Fort Worth and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardware

More services in Fort Worth

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Fort Worth?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Fort Worth.

(855) 912-5373

Request a Free Estimate in Fort Worth

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch