A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Site Prep & Utilities · Keller, TX

ADU Site Prep & Utilities in Keller - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Site Prep & Utilities in Keller, TX: What the Job Actually Involves

ADU Site Prep & Utilities in Keller, TX runs $45,000 – $130,000 for the site work and utility package alone, with most Keller projects landing in the $55,000 – $85,000 band once trenching, slab, electrical service, water and sewer ties, and inspection are counted. Plan on 6 – 10 weeks of site work before any framed walls go up. The number swings hard based on how far you’re running utilities, whether you need a new electrical service, and what the clay does when we dig. Call (855) 912-5373 for a free on-site estimate and a written line-item scope.

Call (855) 912-5373

Keller’s 1990s and early-2000s subdivisions weren’t laid out with detached units in mind. Lot lines are tight, utility easements are already occupied, and the alley-side panels installed two decades ago often can’t carry a second dwelling. That reality is the whole job.

How We Run ADU Site Prep in Keller, Stage by Stage

A garage converted into a guest room and home office

The sequence for ADU Site Prep & Utilities in Keller matters more than the speed, because a missed inspection on the underground work means tearing out finished concrete. Here’s what actually happens.

Stage 1: Site walk and utility locate (Day 1 – 2)

We meet on site, pull the plat and survey, and call in the locate service for existing gas, water, electric and telecom. You’ll decide the ADU footprint and orientation in this window. If the pad can’t clear the side and rear setbacks once we flag the lines, moving it 4 feet now is cheap. Moving it after the slab pour is not.

Stage 2: Trenching and rough utility runs (Day 3 – 7)

Trenching for water, sewer, electrical conduit and any gas line typically takes 3 – 4 working days with a mini-excavator on a standard lot. Keller’s black clay is the wildcard – it’s workable when it has moisture and rock-hard in August, so we schedule trenching to the soil condition and not the other way around. You’ll approve the pipe routes and the depth before anything gets backfilled.

Stage 3: Underground inspection (Day 8 – 12)

The city inspects the underground before the slab goes down. We schedule it, meet the inspector, and handle any corrections on the spot where possible. This is the stage that most often stalls a DIY or hand-picked-trade job, because the plumber and electrician have to be on the same schedule as the concrete crew.

Stage 4: Grading, pad, and slab prep (Day 12 – 20)

We grade for positive drainage away from the ADU and the main house, compact the subgrade, set forms, and place vapor barrier and rebar. On expansive clay this is where the pad gets its structural integrity – a properly over-excavated and compacted base is what keeps the slab from fighting the seasonal movement that Keller soils are famous for.

Stage 5: Utilities tie-in and final connections (Day 20 – 30)

Electrical service, water meter or sub-meter, sewer connection to the lateral, and any gas run get connected and tested. You’ll make your last decision point here: whether to run a dedicated electrical service to the ADU or sub-panel off the main house. A dedicated service costs more up front but avoids overloading a 200-amp main that already carries HVAC, EV charging, and a kitchen.

The whole sequence is what feeds the 6 – 10 week timeline. Weather windows in spring and fall add slack. The 730-Day Done Right Promise covers the workmanship on all of it, from the trench backfill to the final connections.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

ADU Site Prep & Utilities in Keller is really a series of material and system decisions. Here’s what you’re picking and the honest trade-off of each.

  • Slab-on-grade vs. pier-and-beam pad. Slab is faster and cheaper; pier-and-beam handles Keller’s clay movement better if the soil test flags high shrink-swell. On a standard lot the delta runs $8,000 – $18,000 more for piers.
  • Dedicated electrical service vs. sub-panel. A 100-amp dedicated service runs $3,500 – $7,000 in labor and equipment; a sub-panel off the main is $1,200 – $2,500 but caps what the ADU can run simultaneously.
  • Water: separate meter vs. sub-meter. Separate meter is cleaner for rental or family use, at higher tap and impact fees. Sub-meter keeps it on the main account and is the cheaper path.
  • Sewer tie-in vs. grinder pump. Gravity tie-in works when the ADU sits uphill of the lateral. A grinder pump is needed when it doesn’t, adding $2,500 – $5,500 and a maintenance item.
  • Concrete grade and finish. Standard 3,000-psi with broom finish is fine underneath. Exposed pads call for higher PSI and a Quikrete or Sakrete mix spec’d to the finish, and that’s real money.

Driveway and access aprons are often paired with this work. Homeowners frequently pair this with Concrete Driveways & Concrete Work in Keller to connect the ADU pad to the street in one pour, and some go with Paver Driveways in Keller where the finish matters more than the budget.

What ADU Site Prep & Utilities Costs in Keller, TX

A framer checking new wall framing on a home addition

For the site work and utility package alone, expect $45,000 – $130,000 in Keller. That’s site prep and utilities – not framing, finishes, or the structure itself. A full ADU build with everything runs $90,000 – $220,000 on the parent scope.

Line item Keller range
Site walk, survey, utility locate $400 – $1,200
Trenching and underground rough-in $6,000 – $18,000
Electrical service or sub-panel $1,200 – $7,000
Water line and meter $2,500 – $6,500
Sewer tie-in or grinder pump $3,000 – $8,500
Grading, compaction, slab prep $8,000 – $22,000
Piers (if soil demands) $8,000 – $18,000
Inspection coordination and permits $1,500 – $4,500

Five things push a Keller job to the high end: distance from the main house to the ADU pad, whether a dedicated electrical service is required, whether the sewer needs a pump, whether the soil test calls for piers, and the cost of dealing with existing landscaping or an old patio the trench must cross.

Every estimate is written line-item and upfront. The number you see is the number you pay. Permits and inspections are handled in-house. And the Home Additions & ADU in Keller page covers the wider build if you’re weighing a full addition rather than a standalone unit.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Keller Homes Specifically Do to ADU Site Prep & Utilities

Keller’s housing stock is predominantly brick-veneer traditional and Texas-style single-family homes built from the late 1980s through the 2000s – the same wave of master-planned subdivision build-out that defined the city’s growth. That era matters because those lots were surveyed and platted when a detached unit was not a consideration. Rear lot lines are tight, easements are already carrying the existing utilities, and the panels installed in the 1990s are now at or near capacity.

Underneath all of it is the black clay that swells and shrinks between drought and wet seasons. On any ADU pad in Keller, we plan for the soil movement up front rather than discovering it mid-dig. That means an over-excavated and properly compacted base, and a soil-bearing opinion before the slab design is locked, not after. North Texas heat and hail also matter here, but the pad and the trench are what dictate the site package.

HOAs are the other major factor. Most of Keller’s subdivisions have architectural review boards, and the ADU footprint, setbacks, fence line, and utility screening all fall inside their jurisdiction. We coordinate the ARB submission with the permit set so a denial doesn’t stall the schedule. Our technicians have up to 12 years of experience walking these processes in Keller and the surrounding communities like Watauga, North Richland Hills, Saginaw, and Hurst – you can see the coverage on our Keller page.

Serving Keller, TX – Our Local Coverage Area

We serve Keller and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: ADU Site Prep & Utilities in Keller

A new wood side gate with black hardware

Get a Free On-Site Estimate for ADU Site Prep & Utilities in Keller

Call (855) 912-5373 to schedule a free on-site estimate. A live person answers around the clock, and we’ll set a time to walk your lot, flag the utilities, and talk through the utility path and slab options. You’ll get a written line-item scope with real dollar ranges and a schedule. If you’re weighing a larger project, ask about our Home Additions & ADU service while we’re out there.

Written by the team at Groundwork Construction Co.

Why Keller Chooses Groundwork Construction Co. of Fort Worth

We set the standard for ADU site prep & utilities in Keller.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Keller

Getting your ADU site prep & utilities project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU site prep & utilities project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU site prep & utilities pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Keller Customers Say

Trusted by homeowners across Keller and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gate

More services in Keller

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Site Prep & Utilities in Keller?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Keller.

(855) 912-5373

Request a Free Estimate in Keller

Tell us about your ADU site prep & utilities needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch