Concrete Driveways & Concrete Work in Keller, TX: What to Expect
Concrete work in Keller usually means one of three jobs: a new driveway pour ($4,500 – $12,000), a full replacement ($5,000 – $14,000), or a targeted repair on a slab that’s cracked but still sound. A standard two-car driveway runs 3 – 5 working days from demo to the day you can park on it. Call us at (855) 912-5373 for a free on-site estimate with a written line-item quote before any work begins.
Most of our Keller concrete jobs come with a wrinkle the homeowner didn’t plan for: an HOA architectural review that wants paperwork before the first form goes down. We handle that as part of the job, not as an afterthought.
How We Run a Concrete Job in Keller, Start to Finish

Concrete is a schedule-driven trade. Every stage has to finish before the next one starts, and weather can move the whole thing. Here’s the actual sequence we follow.
Stage 1: Site walk and layout (day 1)
We measure the existing slab, check the grade against the house, and mark out the new footprint with string and paint. This is where you decide the shape, the width, the apron, and whether you’re adding a widened turnaround or a third-car pad. We also photograph the HOA-facing pieces: the current finish, the color, and any shared fence line.
Stage 2: Demo and haul-off (days 1 – 2)
A 4-inch residential slab comes out fast with a skid-steer and a breaker. Haul-off is the real time sink on older Keller lots, where a 20-foot-wide driveway can push 8 – 12 cubic yards of debris. We keep the dumpster off the street where the subdivision allows it, and we protect the grass and fence line with plywood before anything rolls in.
Stage 3: Subgrade prep (days 2 – 3)
This is the stage most cheap bids skip. Keller’s black clay soil moves hard between wet and dry seasons, so the subgrade has to be compacted, leveled, and built up with a compacted base where the existing fill has settled. We check for soft spots, over-excavate where needed, and confirm the slope drains away from the foundation. If your slab has already moved, this is the point where we tell you, not the point where we pour over it.
Stage 4: Forms, rebar, and inspection (days 3 – 4)
We set forms, lay rebar or mesh on chairs, and walk the layout with you before pouring. If the job requires a permit or an HOA sign-off, this is where that paperwork has to be complete. Your decision here: finish, color, and joint pattern, all confirmed in writing before the truck arrives.
Stage 5: Pour, finish, and cure (days 4 – 5, plus a 7-day cure window)
We pour, screed, float, and cut control joints. You can walk on it in about 24 hours and park on it after roughly 7 days, depending on heat and humidity. We leave a care sheet for the first 30 days: no de-icing salt, keep the joints clean, water it down in extreme heat.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Concrete Options You’ll Actually Choose Between
Most of the decisions on a concrete job come down to a handful of real choices. Here’s the honest trade-off on each.
- Standard broom finish: The workhorse for Keller driveways. Textured enough to grip in a Texas rainstorm, easy to maintain, and the lowest cost per square foot. It’s the finish most HOA architectural committees expect to see.
- Exposed aggregate: Salt-and-pepper pebble finish that hides dirt and tire marks well and stays cooler underfoot. Runs 15 – 25% higher than broom finish. Sealing every few years keeps it from fading.
- Scored or stamped patterns: Decorative options where the driveway reads as stone or tile. Higher cost, more labor, and worth confirming with your HOA before you commit. We can pull the community standards if you’re unsure.
- Steel vs. fiber mesh reinforcement: Rebar is the stronger choice for a driveway that sees heavy vehicles or sits on expansive clay. Fiber mesh is a cost option that works for lighter loads.
- 4-inch vs. 5 – 6-inch slab: Standard residential thickness is 4 inches. If you park a heavy truck or want a 25-year-plus slab, a thicker pour with a higher PSI mix extends the life. More material, more cost, fewer cracks.
What Concrete Driveways & Concrete Work Costs in Keller, TX

A new concrete driveway in Keller runs $4,500 – $12,000. A full replacement runs $5,000 – $14,000. Those are real numbers for a two-car driveway, and here’s what pushes a job toward either end.
- Square footage: A standard 20×20 two-car pad sits at the low end. A 24×30 pad with a third-car bay or a turnaround pushes toward the top.
- Existing slab condition: Clean demo and haul-off is straightforward. A slab that’s heaved, crumbled, or tied into a fence or retaining wall with no clean break line costs more in labor.
- Subgrade and drainage corrections: Keller clay is unforgiving. If the base needs compaction or the grade needs correcting to drain away from the foundation, that’s a real line item, not a surprise.
- Finish and color: Broom finish at the low end, exposed aggregate or stamped at the high end. Decorative work also takes more crew time.
- Permit and HOA scope: If the job requires a permit or an architectural review submittal, that’s time and a document cost. We tell you up front which jobs need it.
A written line-item estimate from us covers demo, haul-off, subgrade prep, reinforcement, forms, pour, control joints, and finish cleanup. What’s typically outside a base estimate: land survey work, moving an existing utility line, and any structural repair to an attached garage threshold. Upfront pricing means you see those as line items before anyone picks up a shovel.
See the difference
Before
After
Before
After
Before
AfterWhat Keller Homes Specifically Do to a Concrete Job
Keller’s housing stock is dominated by the wave of 1990s to early-2000s master-planned subdivision build-out, and that era shows up in the concrete work. Driveways in 76248 and 76244 are now 25 to 30 years old. That’s the age where a slab that started out fine starts telling you something: hairline cracks that have grown, spalled edges near the street, sunken panels near the garage apron where the fill settled differently than the undisturbed soil next to it.
The clay under the subdivisions does the rest. North Texas’s black clay swells and shrinks hard between drought and wet, so an older driveway is often moving at the same time the foundation next to it is moving. That’s why we check the house grade and the slab’s relationship to the foundation before we pour anything new. If the driveway drained toward the garage for 25 years, a new slab in the same spot will do it again.
Then there’s the HOA reality. Most of Keller’s larger subdivisions have architectural review standards that cover finish, color, and sometimes even the width of the new slab. We pull the community standards before we submit a plan, and we photograph the existing driveway so the review committee can see what the new pour matches. If a neighbor in your subdivision already did the same work, we can reference the approved finish so your submittal moves faster.
Serving Keller, TX – Our Local Coverage Area
We serve Keller and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Concrete Driveways & Concrete Work in Keller

Most Keller concrete driveway jobs run 3 to 5 working days from demo to final cleanup, then about 7 days of cure time before you park a car on it. Weather is the wild card. Concrete doesn’t pour in rain or extreme cold, and North Texas summer heat can mean we finish early in the morning. If you need the driveway back fast, tell us at the estimate and we’ll plan around it.
A straight like-for-like driveway replacement usually doesn’t trigger a building permit, but work that touches a public sidewalk, curb, or right-of-way does. HOA architectural review is a separate requirement and one most homeowners miss. We tell you what applies to your specific address during the free estimate, so the paperwork is settled before we start.
In almost every case, yes. A driveway pour is a surface job, and the foundation, plumbing, and electrical lines under the house stay untouched. The rare exception: a utility riser or gas meter sitting inside the new footprint. When that happens, we coordinate with the utility rather than moving it ourselves. Homeowners often pair a new driveway with ADU Site Prep & Utilities in Keller when they’re planning a backyard addition at the same time.
Not from our written estimate, unless the job uncovers something no one could see: a hidden drain line, a soft spot under the slab, or a subgrade condition that needs correction. We stop and call you before we make that call. That’s what upfront pricing means, and it’s why we do a site walk before we quote anything.
Every project we complete is covered by our 730-Day Done Right Promise. If something isn’t done right, we come back and make it right. That covers workmanship and installation. It doesn’t cover cracks that come from North Texas soil movement after the pour, which is why we prep the base carefully up front.
Get a Free Concrete Estimate in Keller
If your Keller driveway is cracking, spalling, or just past its useful life, we’ll come out, walk the site, and give you a written estimate with line-item pricing. No surprises, no pressure. Call (855) 912-5373 to schedule your free estimate for Concrete Driveways & Concrete Work in Keller. We answer the phone around the clock. If your project touches other parts of the property, it’s often part of a full Driveway & Pavers in Keller scope, and homeowners often pair this with Door Installation in Keller on the same walkthrough. Whether you’re in Keller or anywhere in the surrounding area, our Driveway & Pavers team can walk the site with you and give you a straight number.