A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Keller, TX

New Detached ADU in Keller - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Keller, TX: What It Takes and What It Costs

A new detached ADU in Keller typically runs $90,000 – $220,000 and takes six to nine months from the first design meeting to the final inspection. The lead range for a compliant detached unit on a Keller lot sits at $45,000 – $130,000 for a modest one-bedroom, and climbs from there with size and finish level. Call (855) 912-5373 to schedule a free on-site estimate.

Call (855) 912-5373

How we build a detached ADU, stage by stage

A finished backyard cottage with a small covered porch

The sequence matters more than the sales pitch. Here’s the actual order of work on a Keller detached unit and roughly how long each stage takes.

  • Stage 1: Site assessment and lot verification (1 – 2 weeks). We walk the yard with you, confirm setback distances, check utility routing from the main house, and note the black clay conditions under the proposed footprint. You decide the footprint and the door swing between the ADU and the alley or driveway. Any foundation prep gets flagged here rather than mid-build, which is why we push pier planning to the front.
  • Stage 2: Design and architectural review (3 – 6 weeks). You approve the floor plan, elevation, roofing profile, and exterior materials that will match your existing home. In Keller’s HOA subdivisions, the architectural review board timeline runs parallel to our drawing package. We submit elevations and finish samples early so an ARB rejection doesn’t stall the permit.
  • Stage 3: Permitting and inspections (4 – 8 weeks in Keller). We pull the building permit, then schedule the inspection sequence: foundation, framing, rough-in electrical and plumbing, insulation, and final. You don’t chase the inspector; we do. Permit timing varies with the city’s queue, so this is the stage most likely to slide.
  • Stage 4: Foundation and shell (6 – 10 weeks). Grading and drainage corrections come first, then slab or pier work, framing, roofing, and exterior cladding. You pick exterior colors and the door hardware before this stage starts so we’re not waiting on trim.
  • Stage 5: Systems, finishes, and final walkthrough (6 – 10 weeks). Electrical, plumbing, HVAC, insulation, drywall, cabinetry, flooring, and paint. You make finish selections at the start of this stage, not the middle. Final inspection closes the job, and the 730-Day Done Right Promise covers workmanship from that point.

Total realistic timeline: six to nine months for a fully permitted unit, with permitting and ARB review eating roughly a third of it. Calls are answered by a live person around the clock, and every technician on the site is background-checked and arrives in uniform.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The choices you’ll actually make (and what each one costs you)

A detached ADU is a small house, so most of the decisions mirror new construction, just compressed. Here’s what we see Keller homeowners weighing.

  • Slab versus pier-and-beam foundation. Slab is cheaper and faster but unforgiving on the black clay. Piers cost more up front and handle seasonal soil movement better. Given Keller’s clay, we usually recommend planning for piers or a reinforced slab with drainage corrections.
  • Stick-built versus modular shell. Stick-built gives you full design freedom and matching. A modular shell arrives faster but constrains dimensions. Most Keller lots favor stick-built for ARB matching.
  • Exterior cladding. Brick veneer matches your existing house and satisfies most Keller ARB standards. James Hardie fiber cement is the practical alternative when you want lower maintenance. Composition shingle roofing matches the existing rooflines.
  • Door style and color. HOA rules in Keller’s master-planned subdivisions typically approve specific entry door colors and materials. We submit finish samples to the ARB before ordering, so you don’t eat a rejection.
  • Interior finishes. A rental-grade unit uses stock cabinetry and vinyl plank. An in-law unit calls for KraftMaid cabinetry, a Kohler fixture package, and finishes that hold up. The gap in cost is real; the gap in comfort is bigger.
  • HVAC and utilities. A mini-split system is the least invasive. A full ducted system runs cleaner but requires more rough-in work. Utility routing from the main house versus a separate meter is a decision with long-term cost implications.

What a New Detached ADU costs in Keller, TX

A framer checking new wall framing on a home addition

Plan on $90,000 – $220,000 for a permitted detached ADU in Keller, with the modest one-bedroom end of the range starting around $45,000 – $130,000 depending on how much finish you want. Here’s how the number moves.

Line item Typical range
Design and architectural review Included in estimate, varies with complexity
Permitting and inspections Included in written estimate
Foundation (slab or pier) $8,000 – $25,000
Shell, framing, roofing, cladding $40,000 – $95,000
Electrical, plumbing, HVAC rough-in and finish $18,000 – $45,000
Interior finishes (cabinetry, flooring, paint, fixtures) $15,000 – $55,000

Five variables push a Keller ADU to the low or high end: size (a 400 sq ft studio versus a 1,000 sq ft one-bedroom), foundation conditions (clay soil and drainage corrections add cost), utility distance from the main house, finish grade (stock versus KraftMaid and Cambria), and permit scope (a fully permitted unit versus an unpermitted shed conversion, which we don’t do).

Every written estimate is line-item and fixed. The number you see is the number you pay. 0% financing for 18 months is available, and projects over $10,000 get $1,000 off. Call (855) 912-5373 for an exact quote; estimates are free.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Keller homes specifically do to this job

Keller’s housing stock is dominated by brick-veneer traditional homes built in the late 1980s through the 2000s in large HOA subdivisions. Most of those master-planned neighborhoods are now hitting the 25 – 30 year mark, which means the detached ADU conversation here is really a second-generation construction conversation. The families in these homes are adding a unit for aging parents or adult children, not building new construction from scratch.

Two forces shape the job. First, the expansive black clay under Keller subdivisions swells hard between wet and dry seasons. We plan foundation and drainage corrections up front because discovering a slab problem mid-build is costly. Second, HOA architectural review is a real gatekeeper in ZIP codes 76248 and 76244. Approved door styles and colors, roofline matching, and quiet operation requirements all go into the submission package before we order a single finish. Our background-checked, uniformed technicians work within your community’s standards and match existing panels so an approval doesn’t turn into a violation. Keller’s hail and heat also mean roofing and exterior equipment choices get scrutinized at the ARB stage; composition shingles matched to your existing roof profile usually clear it. If the deeper lot work calls for a new driveway to reach the unit, homeowners often pair this with our Concrete Driveways & Concrete Work in Keller or Paver Driveways in Keller. This whole effort is part of a full Home Additions & ADU in Keller scope, and we cover the wider Keller area for it. If you’re comparing this to a smaller interior project, our Home Additions & ADU service page lays out the full menu.

Serving Keller, TX – Our Local Coverage Area

We serve Keller and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – New Detached ADU in Keller

New architectural shingles with a clean valley

Schedule a free on-site estimate

We’ll walk your lot, confirm setbacks and HOA considerations, and hand you a line-item written estimate for a new detached ADU in Keller. Call (855) 912-5373; a live person answers 24/7. The estimate is free, and the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Keller Chooses Groundwork Construction Co. of Fort Worth

We set the standard for new detached ADU in Keller.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Keller

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Keller Customers Say

Trusted by homeowners across Keller and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in Keller

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Keller?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Keller.

(855) 912-5373

Request a Free Estimate in Keller

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch