A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Keller, TX

ADU Design & Permitting in Keller - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

ADU Design & Permitting in Keller: What It Takes to Get a Permit Approved

ADU design & permitting in Keller gets you a stamped, city-approved set of plans and a clear build budget before anyone breaks ground. Most projects here run 4 to 9 months from first sketch to final inspection, and the build itself falls in the $45,000 – $130,000 range depending on size, site work, and how much of the plan has to satisfy an HOA architectural review. Call (855) 912-5373 for a free estimate and a design consult.

Call (855) 912-5373

Keller is heavy on master-planned subdivisions where the HOA architectural review board (ARB) reviews your plans before the city does. That review, plus the city permit review, is where most timelines either hold or slip.

How the Process Actually Runs, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Design and permitting for an ADU isn’t one step. It’s a sequence, and each stage has its own gate. Here’s how we run it.

Stage 1: Site and Feasibility (Days 1 – 7)

We start with a site visit and a look at your plat and deed restrictions. Keller lots in ZIP codes 76248 and 76244 often have setback, lot-coverage, and rear-yard easement limits that decide how much footprint you can legally add. You decide where you want the ADU (detached, attached, or above a garage) and roughly how big. We confirm what the lot can actually support before you spend money on drawings.

Stage 2: HOA / ARB Submittal (Weeks 2 – 4)

If you’re in an HOA subdivision, the architectural review board gets the plans first. We prepare the submittal packet: elevations, materials (brick to match, roof pitch to match, siding color if applicable), and a site plan showing setbacks and screening. ARB approval usually takes 2 to 4 weeks and can bounce a plan back for material mismatches, so getting the exterior package right the first time matters. You approve the final exterior look here.

Stage 3: Design and Construction Documents (Weeks 3 – 8)

A licensed designer or architect produces the working drawings: floor plan, framing, electrical, plumbing, mechanical, and a foundation plan suited to Keller’s expansive clay. This is where you lock in the layout and finishes. You’ll choose kitchen and bath fixtures, door and window packages, and if you want James Hardie siding, that gets specified here so it matches on the submittal.

Stage 4: City Permit Review (Weeks 6 – 12)

Keller’s building department reviews the permit set for code compliance, structural loads, and energy requirements. Reviews typically run 3 to 6 weeks, and plan-check comments can add a revision cycle. We handle the submittal and the back-and-forth. You don’t have to chase the reviewer yourself.

Stage 5: Permit Issued, Build Begins

Once the permit is issued and the ARB sign-off is on file, we schedule the build. Inspections follow the plan: foundation, framing, rough-in, insulation, and final. A slab foundation on clay soil may get a soil report and an engineered foundation design up front, which is standard for Keller.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Design and Material Choices You’ll Face

Most of the decisions that affect both cost and permit approval come down to a handful of categories. Here’s the honest trade-off on each.

  • Foundation type: A standard slab-on-grade is the most common in Keller and the most economical, but clay movement can crack it without proper grading and drainage. An engineered slab or a pier-and-beam option costs more up front and holds up better on problem lots. The trade-off is real: pay now or pay for foundation repair later.
  • Exterior cladding: Brick to match the main house satisfies most HOAs and ARBs without a fight. James Hardie fiber-cement siding is a strong second and costs less, but some HOAs require a brick or masonry match on street-facing walls, so check before you commit.
  • Roofing: Composition shingle matched to the main house is the default and satisfies most ARBs. Standing-seam metal costs more and looks sharp but may need explicit HOA approval. Either way, the pitch and profile should mirror the house so the ARB doesn’t kick it back.
  • Kitchen and bath cabinets: KraftMaid and Wellborn are both solid mid-to-upper cabinet lines. KraftMaid leans toward stock-to-semi-custom with faster lead times; Wellborn gives you more door style and finish flexibility. Cambria quartz countertops cost more than laminate but hold resale and handle North Texas heat swings without warping.
  • Windows and doors: Vinyl is the budget pick and fine for a detached ADU. Aluminum-clad or fiberglass runs higher but lasts longer and holds a better line against hail.

For the wider project scope, an ADU often pairs with a bigger plan, and our Home Additions & ADU service handles the full-scope side when the project grows.

What ADU Design & Permitting Costs in Keller, TX

A framer checking new wall framing on a home addition

Design and permitting for a Keller ADU typically runs $8,000 – $22,000 on its own, and the full build lands at $45,000 – $130,000. That’s the range for a permitted, ARB-approved, buildable ADU. Here’s what moves the number.

  • Size and footprint: A 400-square-foot studio sits at the low end; a 900-square-foot two-bedroom pushes toward the top.
  • Site and foundation conditions: Clay soil that needs an engineered foundation design, drainage correction, or grading adds cost. This is common in Keller’s older subdivisions.
  • HOA/ARB complexity: A strict architectural review with material-match requirements on brick, roof, and siding adds design time and possibly revisions.
  • Interior finish grade: Builder-grade laminate and vinyl floor vs. quartz counters and custom cabinets is a real gap in the budget.
  • Utility scope: Running new electrical, plumbing, and HVAC from the main house is part of this. Distance and trenching add cost.

A written estimate breaks out design, permit fees, and construction separately. Permit fees and city review costs are pass-through items and get shown as line items, not buried in a lump sum. What’s typically not included: foundation repair on the main house, landscaping beyond basic grading, and any HOA fines or corrections caused by existing non-compliant features.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Keller Homes Specifically Do to This Job

Keller is a second-generation remodel market. The big wave of 1990s and early 2000s master-planned build-out is now 25 to 30 years old, and the work here skews toward remodels, additions, and envelope refreshes on homes that are structurally sound but dated. That means the ADU has to match a house that’s already there, not sit on a fresh lot.

Two local conditions shape every ADU plan. First, the black clay soil swells and shrinks between dry and wet seasons, so foundation design gets treated as a front-end decision, not a mid-project discovery. Second, North Texas hail and heat push roof and cladding specs toward impact-resistant materials and UV-stable finishes. Homes in the 76248 and 76244 subdivisions typically carry brick veneer, composition roofs, and two-story plans, and HOAs in those neighborhoods have architectural review boards that will reject a mismatched exterior. We plan the exterior package around that from day one, and if you’re also redoing the driveway, homeowners often pair this with Paver Driveways in Keller so the approach to the new ADU lines up. We also work across Keller and the surrounding areas when a project spans more than one scope.

Serving Keller, TX – Our Local Coverage Area

We serve Keller and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – ADU Design & Permitting in Keller

A new concrete driveway with a paver border

Get Your Free ADU Design & Permitting Estimate in Keller

We’ll walk your lot, check setbacks and deed restrictions, and come back with a written, line-item estimate covering design, permit fees, and construction separately. Calls are answered by a live person 24/7, and we bring $1,000 off projects over $10,000 plus 0% financing for 18 months. Call (855) 912-5373 to schedule your free on-site estimate for ADU design & permitting in Keller.

Written by the team at Groundwork Construction Co.

Why Keller Chooses Groundwork Construction Co. of Fort Worth

We set the standard for ADU design & permitting in Keller.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Keller

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Keller Customers Say

Trusted by homeowners across Keller and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Keller

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Keller?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Keller.

(855) 912-5373

Request a Free Estimate in Keller

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch