A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Keller, TX

Garage Conversion ADU in Keller - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Keller, TX: What It Costs and How Long It Takes

A garage conversion ADU in Keller, TX typically runs $45,000 – $130,000 and takes 3 – 5 months from permit to final inspection, depending on whether you’re keeping the existing slab and rough-in or relocating plumbing and electrical. The job turns your attached garage into a permitted, code-compliant living space – typically a studio, one-bedroom, or in-law suite – with its own entry, insulation, HVAC, and finishes. Call (855) 912-5373 to schedule a free on-site estimate and a written line-item quote.

Call (855) 912-5373

What to look for in a Keller garage conversion – and how the work actually runs

A garage converted into a guest room and home office

Keller’s HOA subdivisions built through the 1990s and early 2000s mean most garage conversions here start with an architectural review, not a hammer. That changes what a good contractor does first: matching the new window and door style to what your community already approves, keeping the exterior envelope visually consistent with neighboring homes, and documenting everything for your architectural review board (ARB) before demolition. Most homeowners pair the interior build-out with exterior corrections so the converted garage doesn’t read as an obvious retrofit from the street.

Here’s the honest stage-by-stage sequence we run on a garage conversion ADU in Keller:

  • Stage 1 – Feasibility and ARB review (1 – 2 weeks). We measure the existing slab, check ceiling height and structural bearing, and confirm setback and lot-coverage rules with the city. In parallel, you submit the door style, window type, and exterior finish samples to your HOA. You decide here: studio vs. one-bedroom, and whether the garage door face stays as a decorative panel or gets framed and clad.
  • Stage 2 – Permits and design (2 – 4 weeks). Working drawings, energy code compliance, and a permit submittal. If the conversion includes a kitchenette or full bath, plumbing and electrical plans go in with the package. You approve fixture locations and finishes at the end of this stage, not after walls close.
  • Stage 3 – Demo, framing, and rough-in (2 – 3 weeks). The garage door opening is framed and closed, the slab is checked for cracks and moisture, and any foundation movement is corrected before framing begins. New framing for the bath and closet goes up, then plumbing, electrical, and HVAC rough-in. First city inspection happens here.
  • Stage 4 – Insulation, drywall, and systems (3 – 4 weeks). Spray foam or batt insulation to meet current energy code, drywall, then mechanical trim-out. This is the longest stretch and the one most often stretched by change orders – which is why we lock the finish schedule in writing before Stage 3.
  • Stage 5 – Finishes, exterior match, and final inspection (2 – 3 weeks). Flooring, paint, trim, fixtures, and the exterior cladding that has to match your HOA-approved door and window style. Final inspection and certificate of occupancy close the job.

Each stage has a decision point for you, and the whole sequence stays inside one written schedule with fixed pricing so the number you approved doesn’t move. If your garage conversion is part of a full Home Additions & ADU in Keller plan that also touches the main house, we scope both at once so the schedules line up.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between on a garage conversion ADU

Most of the cost spread in a Keller garage conversion comes down to a handful of decisions you make before rough-in. Here’s where the money actually sits:

  • Slab vs. raised floor. Building on the existing slab is the cheapest route, but Keller’s expansive clay soils mean we check for movement first. A raised subfloor over sleepers adds cost but gives you a place to run plumbing and hides an uneven slab.
  • Kitchenette vs. full kitchen. A wet bar with a sink and mini-fridge is a fraction of the cost of a full kitchen with a range and vent hood. If this is a rental unit, most Keller homeowners go kitchenette to stay under the ARB’s exterior venting restrictions.
  • Bath rough-in location. A half-bath tucked against an existing plumbing wall is the cheapest option. A full bath with a shower on the far side of the garage requires breaking the slab and running drain lines – real money, but often necessary for an in-law suite.
  • Exterior door and window style. This is where HOA compliance lives. Many Keller communities approve specific door panel profiles and window grids; we source matching panels so the finished face reads as original construction, not a retrofit.
  • HVAC. A mini-split is the most efficient option for a single-room conversion and avoids tying into your main system. Extending the main HVAC is cheaper up front but stresses the existing unit.

Flooring, paint, and trim are the easy choices – they can be upgraded later. Slab work, plumbing rough-in, and exterior door and window selection are locked once the drywall goes up, so those decisions matter most. If your garage conversion sits on a property where the driveway is also aging, homeowners often pair this with Concrete Driveways & Concrete Work in Keller so the new exterior entry and the approach read as one project.

What Garage Conversion ADU costs in Keller, TX

A framer checking new wall framing on a home addition

A garage conversion ADU in Keller runs $45,000 – $130,000, with most single-bay conversions landing in the $55,000 – $85,000 range. The lead range covers the whole scope from feasibility through final inspection. Here’s the line-item breakdown you’ll see in a written estimate:

Line Item Typical Range
Design, permits, and ARB documentation $3,000 – $9,000
Framing, insulation, and slab preparation $8,000 – $18,000
Plumbing and electrical rough-in and trim-out $6,000 – $16,000
HVAC (mini-split or system extension) $3,500 – $9,000
Bathroom build-out $9,000 – $28,000
Kitchenette or wet bar $4,000 – $13,000
Exterior door, window, and cladding match $4,000 – $12,000
Flooring, paint, and trim $5,000 – $15,000

Five variables push a garage conversion toward the low or high end:

  • Bath scope. A half-bath stays cheap; a full bath with a slab break and new drain line adds meaningfully.
  • Slab condition. Any foundation correction before framing adds cost, and Keller’s clay soil makes this more common than homeowners expect.
  • System extensions. Tying into the main HVAC and panel is cheaper than a dedicated mini-split and subpanel, but only if the existing equipment has capacity.
  • Exterior match complexity. A straightforward door and window match is easy; matching a brick veneer or specific trim profile your ARB requires adds labor.
  • Permit scope. A full permitted unit with a certificate of occupancy costs more than a cosmetic conversion, but it’s the only version that legally qualifies as an ADU.

What’s in a written estimate: permits, inspections, materials, labor, and a fixed schedule. What’s typically not: landscape repair, driveway resurfacing, and anything the ARB requires that wasn’t in the original scope. Those get priced separately before work starts. Estimates are free – call (855) 912-5373 for an exact quote.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Keller homes specifically do to this garage conversion

The black clay soil under Keller’s subdivisions swells and shrinks hard between drought and wet seasons, and that fact alone reshapes a garage conversion. On homes built between the late 1980s and the 2000s – the dominant build window across Keller’s master-planned subdivisions, ZIP codes 76248 and 76244 – we routinely find slab cracks and door-frame separation from seasonal movement. We check the slab before framing and correct foundation issues up front rather than discovering them after the drywall goes in. That’s why foundation and drainage corrections read as a routine stage of this job in Keller, not a surprise.

HOA rules tighten the exterior side of the work. Many Keller communities require specific door panel profiles, window grid patterns, and paint colors, and the ARB review runs on its own timeline – often two to four weeks. We document the approved finishes before demolition so the conversion doesn’t stall waiting on a review. North Texas heat and hail also push insulation and roofing decisions: if your garage shares a roofline with the main house and that roof is nearing replacement, homeowners often pair this with Asphalt Driveways & Resurfacing in Keller for their approach and put the roof replacement on a separate schedule rather than covering a new ceiling twice. We cover Keller and the surrounding cities including Watauga, North Richland Hills, Saginaw, and Hurst, and the Keller service-area page has the full picture.

Serving Keller, TX – Our Local Coverage Area

We serve Keller and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Garage Conversion ADU in Keller

A new front yard fence with a matching gate

Get a free estimate on your garage conversion ADU in Keller

Call (855) 912-5373 to schedule a free on-site estimate for your garage conversion ADU in Keller. We’ll measure the slab, confirm what your HOA will approve, and hand you a written line-item quote with fixed pricing and a real schedule – no surprises once work starts. Calls are answered by a live person 24/7, and our technicians arrive in uniform, background-checked, ready to walk your garage.

Written by the team at Groundwork Construction Co.

Why Keller Chooses Groundwork Construction Co. of Fort Worth

We set the standard for garage conversion ADU in Keller.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Keller

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Keller Customers Say

Trusted by homeowners across Keller and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodel

More services in Keller

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Keller?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Keller.

(855) 912-5373

Request a Free Estimate in Keller

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch