A Groundwork company - serving Fort Worth, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Crowley, TX

New Detached ADU in Crowley - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Fort Worth
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Crowley Costs and How Long It Takes

A new detached ADU in Crowley typically runs $45,000 – $130,000 for the structure itself, with most acreage-property builds landing between 500 and 900 square feet, and takes four to seven months from site work to final inspection. The number depends almost entirely on how much trenching your lot needs, whether the slab meets Crowley’s expansive clay correctly, and what finish level you choose. Call (855) 912-5373 to schedule a free on-site estimate before the design is locked.

Call (855) 912-5373

How We Build a Detached ADU, Stage by Stage

A second-story addition that matches the existing roofline

The real work on a detached ADU happens in a fixed sequence. Knowing what decision lands on your plate at each stage keeps the job moving and keeps surprises off the invoice.

Stage 1: Site walk and soil check (days 1 – 5)

We walk the build pad with you, confirm setbacks from the property line, and check where the sewer line, water tap, and electrical service enter the main house. On Crowley acreage lots, that first visit usually includes spotting the septic field, because the ADU pad cannot sit on top of it. You decide the footprint and orientation at this stage, and that choice drives everything after it.

Stage 2: Permitting through Crowley’s code office (weeks 2 – 6)

Crowley runs its own permitting and inspections through a small city hall, and that changes the calendar. Plan review for a detached structure with plumbing and electrical commonly takes two to four weeks, longer if the plan set needs a revision. We pull the permit and handle the submittal. You sign the application and pay the fee. Nothing gets built before the permit is in hand.

Stage 3: Foundation, slab, and utility trenching (weeks 6 – 10)

This is where Crowley projects live or die. Black clay soil across the area swells and shrinks with the seasons, so we build on a post-tension slab or an engineered pier system depending on the soil report. Excavation, form work, rebar or cable layout, and the inspection that has to pass before the pour typically take two to three weeks. Utility trenching for water, sewer or septic tie-in, and electrical conduit runs in the same window. You choose the slab type with us after the soil report comes back.

Stage 4: Framing, roof, and rough-in (weeks 10 – 20)

Walls go up, the roof goes on, and the trades rough in plumbing, electrical, and HVAC in sequence. Each rough-in gets its own Crowley inspection before it can be covered. In North Texas, we schedule framing early in the morning through the summer because afternoon heat above 100 degrees slows crews and stresses materials. This is when you pick interior layouts, window placement, and whether the unit gets its own electrical meter.

Stage 5: Finish-out and final inspection (weeks 20 – 28)

Insulation, drywall, cabinets, countertops, flooring, fixtures, and paint follow in order. Final inspection covers the whole structure, and we walk it with you before we hand over the keys. Your finish selections are due at the start of this stage. Building materials used across the job come from brand partners we’ve vetted, and every project carries our 730-Day Done Right Promise.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between for a Detached ADU in Crowley

Most of the decisions that shape your ADU budget happen before framing. Here’s what those choices look like in practice.

  • Slab type: post-tension vs. pier-and-beam. A post-tension slab handles Crowley’s clay well and costs less up front. Pier-and-beam runs higher but is easier to level later if the soil moves. Ask your engineer which fits your lot.
  • Unit size. 500 square feet keeps you near the low end of the range. Stepping up to 900 square feet adds real square footage but also raises framing, roofing, and finish costs. Decide early, because the slab and foundation are sized to the footprint.
  • Septic vs. city sewer tie-in. If your Crowley property is on septic, adding an ADU may require a larger drain field or a separate system, and that’s a cost you’ll want quoted before you commit.
  • Finish grade. Builder-grade cabinets, laminate counters, and vinyl plank flooring fit rental or in-law use. KraftMaid cabinets, Cambria surfaces, and tile floors cost more but hold up over a longer horizon.
  • HVAC and insulation. A mini-split is cheaper to install and efficient for a small unit. A full ducted system costs more but keeps temperatures even across multiple rooms.
  • Exterior. Hardie siding and a GAF or CertainTeed shingle roof match the main house and stand up to North Texas hail. Brick or stone veneer costs more and looks closer to the primary home.

What a New Detached ADU Costs in Crowley, TX

A framer checking new wall framing on a home addition

Expect $45,000 – $130,000 for a detached ADU in Crowley. That range is wide because five variables move the number more than anything else:

  • Size. Every 100 square feet of additional footprint adds framing, roofing, and finish cost.
  • Foundation and soil. A pier-and-beam or post-tension system sized for Crowley’s clay adds cost over a standard slab, and site leveling on a sloped acreage lot adds more.
  • Utility runs. Long trench runs to a septic field or a distant electrical service push the low end toward the high end.
  • Finish level. Builder-grade interiors sit near $45,000; a fully finished unit with premium cabinetry and tile sits closer to $130,000.
  • Permit scope. A structure with full plumbing and electrical carries a different permit scope than a shell with no fixtures, and the inspection schedule follows.

Our written estimate is line-item: foundation, framing, roof, utilities, finishes, and permit fees each get their own line, and the number you see is the number you pay. What’s usually excluded is landscape restoration after trenching and any foundation repair the main house needs. Those get quoted separately if they come up. You’ll also have the option of 0% financing for 18 months and $1,000 off projects over $10,000.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Crowley Homes Do to a Detached ADU Build

Crowley is a fast-growing suburb on Fort Worth’s southern edge, where new master-planned subdivisions sit alongside remaining ranch acreage, and building permits run through the city’s own code office in ZIP 76036 rather than through Fort Worth. That matters for you: plan review and inspections follow Crowley’s schedule, its own inspectors, and its own revision cycles, which can add two or three weeks compared with a build inside a larger city. On the older 1970s-to-1990s ranch homes that still sit on large lots, we frequently find older electrical panels that need upgrading before they can carry a second structure, and a septic system that may need to be resized to serve the ADU. Those two items alone can shift the budget by several thousand dollars. If your lot has room and you want the yard finished at the same time, many homeowners often pair this with Concrete Driveways & Concrete Work in Crowley to run a path or apron out to the new unit, and we can lay a matching walkway with Quikrete or Sakrete materials so the ADU reads as part of the property rather than an add-on. Because of the clay soil, foundation repair also factors into many local bids, which is why we look at the main house’s brick and door alignment before we pour a slab twenty feet away. This is all part of a full Home Additions & ADU in Crowley scope when the unit sits next to a larger project on the same lot. If you’re comparing cities, our Crowley service area page spells out what we cover.

Serving Crowley, TX – Our Local Coverage Area

We serve Crowley and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Crowley

A new wood side gate with black hardware

Schedule Your Free On-Site ADU Estimate in Crowley

A new detached ADU is a serious project on a real piece of land, and the estimate should reflect that. Call (855) 912-5373 to book a free on-site visit. A live person answers around the clock, and we’ll walk the lot, check the septic and panel situation, and walk you through what a unit on your property will cost and how long it will take. Estimates are free, and financing options are available.

Written by the team at Groundwork Construction Co.

Why Crowley Chooses Groundwork Construction Co. of Fort Worth

We set the standard for new detached ADU in Crowley.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Crowley

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Crowley Customers Say

Trusted by homeowners across Crowley and surrounding areas.

★★★★★

"Found unpermitted work by the previous owner once he opened the wall. He stopped, explained the options and what each would cost, and let me decide rather than making it my emergency."

Marco Castillo
★★★★★

"The finished work is exactly what we wanted. It did run about three weeks over, mostly waiting on a cabinet delivery that was out of his hands, though I would have liked more updates during that stretch."

Dev Sharma
★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new front entry door with glass sidelightsA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porch

More services in Crowley

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Fort Worth

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Fort Worth team

A local vetted partner works across Fort Worth and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Crowley?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Crowley.

(855) 912-5373

Request a Free Estimate in Crowley

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Us
Local Service Coverage
Call Now - 24/7 Dispatch